Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/10926
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorVelarde Dorrego, Jesús Eufrasio-
dc.contributor.authorBendezú Anyaipoma, Eber-
dc.creatorBendezú Anyaipoma, Eber-
dc.date.accessioned2018-05-03T00:49:20Z-
dc.date.available2018-05-03T00:49:20Z-
dc.date.issued2017-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/10926-
dc.description.abstractLa tesis contiene un total de 5 capítulos, cuyo tema central radica en realizar un completo estudio y aplicación acerca de la nueva ley de contrataciones del estado NO30225 y su respectivo reglamento, centrándonos en los procedimientos, conceptos y normas para realizar una correcta valorización de obra públicas con prestaciones adicionales y ampliaciones de plazo, siendo estas dos últimas muy comunes en nuestro país y causantes de los sobrecostos de la obras públicas, a fin de 'encontrar las deficiencias en la norma que generen y se relacionen con los sobrecostes de las obras públicas, además de realizar aclaraciones a la norma N O30225. En el primer y segundo capítulo de la tesis comprende la introducción y el marco teórico respectivamente, en el primer capítulo se detalla la problemática que nos llevó a realizar este estudio, que en resumen son los sobrecostos generados por adicionales y ampliaciones de plazo en obras públicas y su relación con la norma que la rige. En el segundo capítulo se incluyen todos los conceptos y normas que serán tema de estudio y aplicación para la comprensión y elaboración del tema de la presente tesis. En el tercer capítulo se centrará en realizar el estudio, además de entrar en detalle acerca de las normas vigentes que rigen los procesos de deductivos, prestaciones adicionales y ampliaciones en obras públicas, notando que las valorizaciones y sus adicionales en estos procesos dependen del tipo de obra y del sistema de contratación por la cual determinada obra fue contratada. En el cuarto capítulo, se plantea un caso aplicativo, una obra por contrata a suma alzada que cumpla con las características necesarias para desarrollar nuestro tema, y se muestra la metodología del cálculo de las valorizaciones de la obra “Adecuación, Mejoramiento Y Sustitución De La Infraestructura Educativa Y Equipamiento De La I.E. Juan Guerrero Quimper”, además de tener un caso real para dar análisis a la norma. En el quinto capítulo se interpreta y analiza las normas correspondientes al periodo de ejecución de obra poniéndole mayor interés a las relacionadas con los adicionales y ampliaciones de plazo, a fin de encontrar las deficiencias que tiene la norma NO30225, y generar ideas que solucionen tales deficiencias.es
dc.description.abstractThis thesis contains a total of five chapters, whose focus in a complete study of the new State contracting law No. 30225 and its regulations, addition to the rules process of readjustment; focusing on procedures, concepts and rules to do a right valorizaron in public work with additionals and extensions of time, being the latter two, very common in our country and cause of the costs of public works, To find the deficiencies in the norm that can generate extra costs in the public works, besides making clarifications of the same. The first and second chapter of this thesis ineludes the introduction and the theoretical framework respectively, in the first chapter the problems that led us to do this study is detailed. Which in summary are the cost overruns generated by additional and extensions of term in public works and its relation with the rule that governs it. In the second chapter all concepts and rules will be the subject of study and application for understanding and developing the theme of this thesis are included. In the third chapter will focus on the study also going into detail about the existing rules goveming the processes of deductive, additional and expansions in public works, noting that the valorization of these processes depend on the type of work and the system recruitment for which particular work was contracted. In the fourth chapter, have an application case, a work contract for a lump sum that has the necessary characteristics to develop our theme, which aims to show the methodology of calculating the valuations of the work public "Adaptation, improvement and replacement Educational infrastructure and equipment El Juan Guerrero Quimper ", In addition to having a real case to give analysis to the standard. The fifth chapter interprets and analyzes the norms corresponding to the execution period of works, putting more interest to those related to the additions and extensions of term, In order to find the deficiencies that has the norm No. 30225, and to generate ideas that solve such deficiencies.en
dc.description.uriTesises
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/restrictedAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectObras públicases
dc.subjectGestiónes
dc.subjectProyectoes
dc.titleValorizaciones y liquidaciones de obras públicas con adicionales y ampliaciones de plazo aplicando las normas vigenteses
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero Civiles
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Civiles
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería Civiles
thesis.degree.programIngenieríaes
Aparece en las colecciones: Ingeniería Civil

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Bendezú_ae.pdf18,49 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI