dc.contributor.advisorUlloa Velásquez, Félix Wilfredo-
dc.contributor.authorManrique Maguiña, Jorge-
dc.creatorManrique Maguiña, Jorge-
dc.date.accessioned2018-06-22T20:09:06Z-
dc.date.available2018-06-22T20:09:06Z-
dc.date.issued2017-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/12201-
dc.description.abstractEl objetivo del presente informe “ANALISIS COMPARATIVO DE COSTOS EN PLANTA DE PROCESOS DE PROYECTOS MINEROS EN ZONAS DE GRAN ALTITUD”, es analizar ratios de costos y metrados de las zonas operativas de la planta de procesos de 2 proyectos mineros de gran envergadura. Con los resultados obtenidos de los análisis, se ha podido elaborar un tercer proyecto a nivel de ingeniería de factibilidad a base de ratios e información preliminar. Se hace referencia al término “Zona de gran altitud” en el título del informe a proyectos que se encuentran a una altitud superior de los 4000 m.s.n.m. Por motivos de confidencialidad, en el presente informe no se dará detalles de las empresas que participaron en la elaboración de la ingeniería (Se le mencionara a la empresa como “Empresa consultora ABC”), ni en el proceso constructivo de la planta de procesos. El informe presenta el presupuesto de las obras civiles y de estructuras metálicas de dos plantas de procesos de minerales de proyectos mineros, además se indicará los costos totales de las otras disciplinas participantes en el presupuesto (Movimiento de tierra masivo, equipos mecánicos, Instalación de tuberías, Instalaciones eléctricas y equipos de Instrumentación) como referencia del monto total (Ver Anexo 5). Los nombres de los proyectos los mencionaremos de la siguiente manera para mantener en reserva los nombres de los proyectos involucrados: Proyecto N°1 Proyecto N°2 Y al proyecto al cual se le aplicara los ratios de costos y metrados se le mencionara como “Proyecto de Factibilidad” en el Capítulo VI. Los costos de los presupuestos del Proyecto N°1 (Capítulo III) y del Proyecto N°2 (Capítulo IV), solo hace mención a los costos directos, no incluyen costos indirectos, IGV ni contingencia. Dichos costos solo hacen referencia al Capex del proyecto no al Opex.es
dc.description.abstractThe objective of this report "COMPARATIVE ANALYSIS OF COSTS IN MINING PROJECTS PLANT IN HIGH ALTITUDE ZONE" is to analyze ratios costs and quantity estimate of the operational zones of the process plant of 2 large scale mining projects. With the results obtained from the analyzes, it has been possible to elaborate a third project at the level of feasibility engineering based on ratios and preliminary information. The term "High Altitude Zone" referenced in the report title refers to projects that are located at an altitude above 4000 meters above sea level. For reasons of confidentiality, this report will not give details of the companies that participated in the elaboration of the engineering, nor in the construction process of the process plant. The report presents the budget for the civil works and metallic structures of two mineral processing plants of mining projects, in addition will be indicated the total costs of the other disciplines involved in the budget (Massive earth movement, mechanical equipment, Pipeline installation, Electrical installations and Instrumentation equipment) as a reference of the total amount. The names of the projects will be mentioned as follows to keep in reserve the names of the projects involved: Project N ° 1 Project N ° 2 We name as "Feasibility Project" in Chapter VI to the project to which ratios cost and quantity estimate (Bill of quantities) will be applied. The costs of the budgets of Project N ° 1 (Chapter III) and Project N ° 2 (Chapter IV), only mention direct costs, do not include indirect costs, IGV or contingency. These costs only refer to the Capex of the project, not Opex.en
dc.description.uriTrabajo de suficiencia profesionales
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectProyectos mineroses
dc.subjectPresupuesto de obras civileses
dc.titleAnálisis comparativo de costos en planta de procesos de proyectos mineros en zonas de gran altitudes
dc.typeinfo:eu-repo/semantics/reportes
thesis.degree.nameIngeniero Civiles
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Civiles
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería Civiles
thesis.degree.programIngenieríaes
Aparece en las colecciones: Ingeniería Civil

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
manrique_mj.pdf7,39 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI