Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/1269
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Chávez Valdivia, Adolfo Jesús | - |
dc.contributor.author | Aponte Espinoza, Elber | - |
dc.creator | Aponte Espinoza, Elber | - |
dc.date.accessioned | 2015-08-25T20:08:13Z | - |
dc.date.available | 2015-08-25T20:08:13Z | - |
dc.date.issued | 2014 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/1269 | - |
dc.description.abstract | Se tenía la saturación de aire viciado en los accesos principales rampa del O-A5 y galería del Nv 10, presentándose un desfogue limitado generándose temperatura alta en la galería principal Nv 10, temperatura alta en la zona profunda, perdida de presión estática en los ventiladores auxiliares por usar mangas de menor diámetro 36” y uso de ductos metálicos para reducir desde 48” a 36” en una distancia de 1.5m generando perdida de presión estática, ventilación de la zona alta (I) con aire viciado de la zona II. Después de haber desarrollado el estudio del circuito del sistema de ventilación, se diseñó la modificación y la implementación del circuito del sistema de ventilación utilizando el Software VnetPC-2003. Se mejoró el sistema de ventilación reduciendo el aire viciado en los accesos principales al integrar la columna A6 al Nv 51 y a su vez se instaló ventilador de 300,000 cfm en el Nv 51, Nv 0 se instaló ventilador de 200,000 cfm para extraer el aire de la zona profunda, se cambió las mangas a mayor diámetro 40” y se implementó ducto reducción de 48” a 40” de lona en una distancia de 8m evitando la perdida de presión estática. Así garantizar la continuidad operativa de la mina a largo plazo, el objetivo de evitar en lo máximo posible el aire viciado, contar con más puntos de desfogue y caudal, reducir las altas temperaturas en diversos niveles y labores de operación; cubriendo así la demanda de aire, durante la etapa de explotación, preparación y desarrollos a fin de brindar un ambiente seguro, saludable y confortable cumpliendo la normatividad legal. | es |
dc.description.abstract | Stale air saturation in the main access ramp O- A5 and gallery had Nv10 , presenting a limited vent generating high temperature in the main gallery Nv10 high temperature in the deep zone , loss of static pressure fans auxiliary to use smaller diameter sleeves 36 " and using metal ducts to reduce from 48" to 36 " for a distance of 1.5m loss generating static ventilation uptown ( I) with stale air pressure zone II . Having developed the study of circuit ventilation system modification and circuit implementation of the ventilation system using the Software VnetPC -2003 was designed. Ventilation reducing the stale air in the main entrances to integrate column A6 to Nv 51 and turn fan 300,000 cfm in Nv 51 was installed was improved,Nv 0 fan 200,000 cfm was installed to remove air from the deep zone , sleeves switched to larger diameter 40 " pipeline reduction was implemented from 48" to 40 " canvas at a distance of 8m avoiding the loss of static pressure. So ensure the operational continuity of the mine long -term goal of avoiding as much as possible stale air, have more points and exhaust flow, reduce high temperatures and work at various levels of operation; thus covering air demand during the operational phase, preparation and developments in order to provide a safe, healthy and comfortable environment in compliance with legal regulations. | en |
dc.description.uri | Tesis | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/openAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Sistema de ventilación | es |
dc.subject | Unidad minera | es |
dc.subject | Aire viciado | es |
dc.title | Modificación e Implementación del Sistema de Ventilación de la Unidad Minera Cobriza Zona Norte (Área Coris) | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero de Minas | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgica | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería de Minas | es |
thesis.degree.program | Ingeniería | es |
Aparece en las colecciones: | Ingeniería de Minas |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
aponte_ee.pdf | 2,84 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por: