Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/12897
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.authorPalacios M., Juan D.-
dc.contributor.authorRachi M., José F.-
dc.contributor.authorDelgado D., Oscar E.-
dc.creatorDelgado D., Oscar E.-
dc.creatorDelgado D., Oscar E.-
dc.date.accessioned2018-08-01T22:25:21Z-
dc.date.available2018-08-01T22:25:21Z-
dc.date.issued2017-12-01-
dc.identifier.citationPalacios M., J., Rachi M., J., & Delgado D., O. (2017). Estudio de pre‐factibilidad y diseño de un sistema de captación y transporte de biogás para generación eléctrica en lagunas de estabilización de San José‐Lambayeque. Revista TECNIA, 27(2), 73. https://doi.org/10.21754/tecnia.v27i2.177es
dc.identifier.issn2309-0413-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/12897-
dc.description.abstractCon el objetivo de poder reducir las emisiones de gases de efecto invernadero (GEI) producidas por las lagunas anaerobias de la planta de tratamiento de aguas residuales del distrito de San José en Lambayeque y conseguir una fuente de energía renovable que pueda hacer autosustentable a la planta se realizó el Estudio de pre‐factibilidad y diseño de un sistema de captación y transporte de biogás para la generación eléctrica; inicialmente se observaron y recopilaron datos del estado actual del sistema y las condiciones de la planta, posteriormente mediante el análisis de datos obtenidos y aplicación de lineamientos del Banco Interamericano de Desarrollo (BID) para proyectos de Mecanismos de Desarrollo Limpio (MDL) se buscó estimar las cantidades de GEI emitidas al medio ambiente, siendo estas de 33885,04535 tCO2e/año; se procedió a realizar propuestas de solución al problema; siendo un sistema de cubierta la propuesta considerada más adecuada, después se procedió a estimar la reducción de emisiones con el Proyecto obteniendo 27620,36 tC02/año y el potencial de generación anual. Una vez estimado lo anterior se procedió a la realización del diseño preliminar de la planta de biogás y finalmente se culminó con la evaluación económica para dando un Valor Actual Neto (VAR) y una Tasa Interna de Retorno (TIR) que confirmó la pre‐factibilidad del proyecto.es
dc.description.abstractThe pre‐feasibility study and design of a biogas recovery and transport system for power generation was carried out. The purpose of this study was twofold: to reduce the emissions of greenhouse gases (GHG) produced by the anaerobic lagoons of the San José (Lambayeque) wastewater treatment plant; and to obtain a renewable energy source that could make the plant self‐sustaining. Initially, information on the current state of the system and on the plant operating conditions was collected. Then, after analyzing the data obtained and applying the guidelines of the Inter‐American Development Bank (IDB) for Clean Development Mechanism (CDM) projects, the amounts of GHG emitted in the environment was estimated to 33,885 t CO2e / year. Solutions to the problem were then proposed and, among them, a cover system was considered as the most appropriate. This allowed an estimation of the annual generation potential with the project and the reduction of emissions to 27,620.36 tC02 / year. With the above estimates, a preliminary design of the biogas plant was carried out. Finally, an economic evaluation was completed, giving a Net Present Value (NPV) and an Internal Rate of Return (IRR) that confirmed the pre‐feasibility of the project.en
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.relationinfo:eu-repo/semantics/articlees
dc.relation.ispartofseriesVolumen;27-
dc.relation.ispartofseriesNúmero;2-
dc.relation.urihttp://revistas.uni.edu.pe/index.php/tecnia/article/view/177es
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectCaptación y transporte de biogáses
dc.subjectTratamiento de aguas residualeses
dc.subjectPre‐factibilidades
dc.subjectMecanismos de desarrollo limpioes
dc.titleEstudio de pre‐factibilidad y diseño de un sistema de captación y transporte de biogás para generación eléctrica en lagunas de estabilización de San José‐Lambayequees
dc.titlePre‐feasibility study and design of a biogas recovery and transport system from the San José (Lambayeque) stabilization ponds towards a power generating stationen
dc.typeinfo:eu-repo/semantics/articlees
dc.identifier.journalTECNIAes
dc.description.peer-reviewRevisión por pareses
dc.identifier.doihttps://doi.org/10.21754/tecnia.v27i2.177es
dc.contributor.emailjdiegopamo@hotmail.comes
dc.contributor.emailjoserachi_9_2@hotmail.comes
dc.contributor.emailedinsondiaz.1695@gmail.comes
Aparece en las colecciones: Vol. 27 Núm. 2 (2017)

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
TECNIA_Vol.27-n2-Art. 4.pdf506,82 kBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI