Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/16410
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorGonzáles Pacheco, Graciela-
dc.contributor.authorAquino Aquino, José Luis-
dc.creatorAquino Aquino, José Luis-
dc.date.accessioned2019-03-01T16:50:27Z-
dc.date.available2019-03-01T16:50:27Z-
dc.date.issued2018-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/16410-
dc.description.abstractSe presenta en esta tesis el desarrollo y los resultados del "Evaluación Geomecánica del Macizo Rocoso en la Unidad de Producción Orcopampa- Mina Chipmo, para determinar un Método de Minado Alternativo para la Explotación en Vetas Angostas" de la Unidad Minera Orcopampa de Compañía de Minas Buenaventura S.A.A. con el objetivo de buscar nuevas alternativas de métodos de minado subterráneo que a su vez sean seguros y de mayor eficiencia que el método de minado que actualmente se utiliza. En el Capítulo 1, se presenta la formulación del Plan de Proyecto. En el Capítulo 2 se presentan generalidades sobre el trabajo de la tesis. En los Capítulos 3 ,4 ,5 y 6 se presenta el desarrollo de la información básica sobre la geología del yacimiento, investigación de campo, ensayos de laboratorio y clasificación geomecánica, esta información está asociada a los factores principales que controlan la estabilidad de las excavaciones subterráneas, y a los parámetros geomecánicos. Utilizando toda la información geológica y geomecánica desarrollada en los Capítulos 3, 4, 5 y 6 y con las herramientas de cálculo de la mecánica de rocas, se ha llevado a cabo análisis, mediante los cuales se logró determinar las direcciones preferenciales de avance de las labores mineras, aberturas máximas y el sostenimiento de las labores mineras tanto permanentes como temporales; de la misma manera se ha evaluado la influencia del arreglo estructural de la masa rocosa y la influencia de los esfuerzos inducidos sobre las condiciones de estabilidad local y global de las excavaciones mineras asociadas al minado de la Mina Chipmo. Toda esta información se presenta en el Capítulo 7. Utilizando toda la información desarrollada en esta tesis, se han definido los métodos de minado alternativos para la explotación de Mina Chipmo. Se concluye que, el método de minado "corte y relleno ascendente" (C&F), que actualmente se utiliza en Mina Chipmo, es el que se adapta mejor a todo el rango de las condiciones naturales encontradas en el yacimiento. Para los sectores de condiciones geomecánicas más favorables como son los casos de vetas Lucía Centro, Lucía Centro Ramal, Lucía Ramal 2 y Lucía Ramal 3, se puede considerar al método de minado "bench and fill” (B&F) como una alternativa de minado factible para ser utilizado en estas vetas. Toda esta información es presentada en el Capítulo 8. Cabe señalar que el método de minado B&F ha sido dimensionado geomecanicamente, de esto se han establecido los parámetros de diseño, los mismos que tienen que ser tomados en cuenta por los ingenieros de planeamiento, para formular diseños del minado con el método propuesto y así poder realizar la evaluación económica correspondiente, para obtener una evaluación técnica-económica.es
dc.description.abstractThis thesis presents, the development and results of the "Geomechanical Assessment of the Rocky Massif in the Orcopampa Production Unit- Chipmo Mine, to determine an Alternative Mining Method for the Exploitation in Narrow Veins" of the Chipmo Mine, with the aim of looking for new alternatives for underground mining methods that in turn are safe and more efficient than the mining method currently used. In Chapter 1, the formulation of the Project Plan is presented. Chapter 2 presents generalities about the work of the thesis. Chapters 3, 4, 5 and 6 present the development of basic information on the geology of the deposit, field research, laboratory tests and geomechanical classification, this information is associated with the main factors that control the stability of underground excavations, and the geomechanical parameters. Using all the geological and geomechanical information developed in Chapters 3, 4, 5 and 6 and with the tools to calculate the mechanics of rocks, analyzes have been carried out, through which it was determined: the preferential directions of mining tunnels, maximum openings and the type of rock support of both permanent and temporary mining tunnels; In the same way, the influence of the structural disposition of the rock mass and the influence of the induced stress on the local and global stability conditions of the mining excavations associated with the mining exploitation of the Chipmo Mine has been evaluated. All this information is presented in Chapter 7. Using all the information developed in this thesis, alternative mining methods have been defined for the exploitation of Chipmo Mine. It is concluded that the method of mining "cut and fill up" (C & F), which is currently used in Chipmo Mine, is the one that best adapts to the entire range of natural conditions found in the deposit. For the sectors with the most favorable geomechanical conditions such as the cases of Lucia Centro, Lucía Centro Ramal, Lucía Ramal 2 and Lucía Ramal 3, the "bench and fill" (B & F) mining method can be considered as a feasible mining alternative. To be used in these veins, all this information is presented in Chapter 8. It should be noted that the B & F mining method has been dimensioned geomechanically, from this the design parameters have been established, which have to be taken into account by the planning engineers, to formulate mining designs with the proposed method and thus be able to perform the corresponding economic evaluation, to obtain a technical- economic evaluation.en
dc.description.uriTesises
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/restrictedAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectAspectos geológicoses
dc.subjectMétodos de explotación de minases
dc.subjectMacizo rocosoes
dc.titleEvaluación geomecánica del macizo rocoso en la unidad de producción Orcopampa - Mina Chipmo, para determinar un método de minado alternativo para la explotación en vetas angostases
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero Geólogoes
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgicaes
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería Geológicaes
thesis.degree.programIngenieríaes
Aparece en las colecciones: Ingeniería Geológica

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
aquino_aj.pdf7,55 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI