Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/18160
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorChávez Valdivia, Adolfo Jesús-
dc.contributor.authorRodríguez Jesús, Néstor Enrique-
dc.creatorRodríguez Jesús, Néstor Enrique-
dc.date.accessioned2019-07-08T19:19:18Z-
dc.date.available2019-07-08T19:19:18Z-
dc.date.issued2019-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/18160-
dc.description.abstractEl presente trabajo de tesis presenta un análisis técnico - económico de los ingresos, costos e inversión involucrados en el rubro minero, para ello se tomó como caso práctico una mediana minera de vetas angostas ubicada en el departamento de Ica (El Sol Naciente Tercero) propiedad de la empresa minera S.M.R.L. Gotas de Oro. Esta memoria analiza el incremento del 100% de la producción total de la mina, debido al inicio de operación de la veta Rosita; pero sin reducir, significativamente, el aporte de tonelaje de mineral, de los otros cuerpos mineralizados en operación (Veta Gino I, Gino II, Icas I e Icas II). Se programa para el año 2017 incrementar de forma progresiva la producción mensual de la mina con el objetivo de alcanzar las 4000 toneladas por mes. Para el año 2018 y 2019 se plantea mantener dicha producción, priorizando las labores de exploración debido la presencia de 02 vetas adicionales a las antes mencionadas, además de cuerpos mineralizados vírgenes que podrían sustentar, adecuadamente, los futuros proyectos de crecimiento. Por lo que el presente trabajo de investigación, en primer lugar, analiza las expectativas del precio de los metales involucrados en esta tesis; en segundo lugar, describe las características geológicas propias del yacimiento minero; en tercer lugar, se presenta un cálculo actualizado de los recursos y reservas con las que cuenta el yacimiento. Luego se presenta de forma concreta los estudios geomecánicos para realizar un adecuado diseño del método de Corte y Relleno Ascendente. Se presenta de forma resumida los aspectos de la ventilación, en función, de los requerimientos del personal, equipos y tipos de labores; también se especifican los equipos y servicios auxiliares necesarios para realizar la operación de minado. Con toda esta información técnica, se procede a realizar el programa de avances y producción sobre las vetas en explotación, para cumplir con el tonelaje planteado en esta tesis. Obtenido el programa de producción y leyes por mes para los años planteados, se procede a realizar la valorización del mismo, considerando el precio del mercado de los metales, involucrados en la investigación; obteniendo los ingresos por ventas del concentrado. Con los ingresos y costos calculados, se realiza la evaluación económica de la mina El Sol Naciente Tercero, es decir se determina el Cash Cost, para determinar el margen operativo de la mina. Además, se realiza un análisis de las inversiones necesarias (Capex) para cumplir con los objetivos planteados. Por último, se presenta un análisis de sensibilidad unidimensional, conclusiones y recomendaciones de los resultados obtenidos.es
dc.description.abstractThe present thesis presents a technical - economic analysis of the income, costs and investment involved in the mining sector, for this was taken as a case study a narrow vein mining median located in the department of Ica (El Sol Naciente Tercero) property of the mining company S.M.R.L. Gotas de Oro. This report analyzes the increase of 100% of the total production of the mine, due to the start of operation of the Rosita vein; but without significantly reducing the contribution of ore tonnage, of the other mineralized bodies in operation (Vein Gino I, Gino II, Icas I and Icas II). It is scheduled for 2017 to gradually increase the monthly production of the mine, with the aim of reaching 4000 tons per month. For the year 2018 and 2019 it is proposed to maintain this production, prioritizing the exploration work due to the presence of 02 additional veins to the aforementioned, in addition to virgin mineralized bodies that could adequately support future growth projects. So the present research work, first, analyzes the price expectations of the metals involved in this thesis; Second, it describes the geological characteristics of the mining site; third, an updated calculation of the resources and reserves with which the deposit is available is presented. Then the geomechanical studies are presented in a concrete way to carry out an adequate design of the Ascending Cutting and Filling method. The aspects of ventilation are summarized, depending on the requirements of the personnel, equipment and types of work; the auxiliary equipment and services necessary to perform the mining operation are also specified. With all this technical information, we proceed to carry out the program of advances and production on the veins in operation, to comply with the tonnage proposed in this thesis. Obtained the production program and laws per month for the years considered, proceeds to make the valuation of it, considering the market price of metals, involved in the investigation; obtaining income from sales of the concentrate. With the income and costs calculated, the economic evaluation of the El Sol Naciente Tercero mine is performed, that is, the Cash Cost is determined, to determine the operating margin of the mine. In addition, an analysis is made of the necessary investments (Capex) to meet the objectives set. Finally, a one-dimensional sensitivity analysis, conclusions and recommendations of the results obtained are presented.en
dc.description.uriTesises
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectUnidades minerases
dc.subjectPlan de minado subterráneoes
dc.subjectMina de vetases
dc.titlePlan de minado subterráneo a mediano plazo para una mina de vetas angostas, aplicado en la unidad minera El Sol Naciente tercero de la empresa minera S.M.R.L. Gotas de Oroes
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero de Minases
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgicaes
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería de Minases
thesis.degree.programIngenieríaes
renati.advisor.orcidhttps://orcid.org/0000-0003-0625-1495es
renati.author.dni46591354-
renati.advisor.dni07414011-
renati.typehttp://purl.org/pe-repo/renati/type#tesises
renati.levelhttp://purl.org/pe-repo/renati/nivel#tituloProfesionales
renati.discipline724026-
renati.jurorCorimanya Mauricio, José Antonio-
renati.jurorHernández Díaz, Víctor Manuel-
dc.publisher.countryPEes
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.07.05es
Aparece en las colecciones: Ingeniería de Minas

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
rodriguez_jn.pdf2,77 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI