Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/19879
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Chávez Valdivia, Adolfo Jesús | - |
dc.contributor.author | Mejía Ángeles, Robert Luis | - |
dc.creator | Mejía Ángeles, Robert Luis | - |
dc.date.accessioned | 2021-02-24T20:54:47Z | - |
dc.date.available | 2021-02-24T20:54:47Z | - |
dc.date.issued | 2019 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/19879 | - |
dc.description.abstract | El presente estudio corresponde a la reestructuración de todo el sistema de bombeo de la Empresa Explotadora de Vinchos LTDA SAC, para poder profundizar la rampa María Inés, en 6 niveles (equivalente a 120 mts verticales), y extraer las reservas de mineral que ahí se encuentran. El caudal de bombeo es de 162 L/s, para una altura estática de 205 mts, el cual se llevará a cabo en dos tramos bien diferenciados pero complementarios que trabajaran en serie. En el primer tramo, el bombeo se llevará a cabo con 5 bombas sumergibles BS 2400 HT, (4 trabajando permanentemente y 1 en stand by). Estos van a estar colocados en la CA 846 S del Nv.3905 y drenaran el agua hasta el Nv.4005, un total de 100 mts de altura estática a través de 10 tuberías de polietileno de 4 pulgadas cada una, instalados en la CH 818. Esta nueva cámara de bombeo incrementara el rendimiento y la eficiencia de las bombas sumergibles, así como su tiempo de vida útil. En el segundo tramo, el bombeo será con 3 bombas estacionarias, con una capacidad de 90 L/s, cada una (2 trabajando permanentemente y 1 en stand by). Estos serán colocados en el Nv. 4005, y drenara el agua hasta la superficie, ubicado en el Nv. 4105, un total de 105 mts de altura estática. El agua subirá a través de 2 tuberías de acero de 10 pulgadas de diámetro, instalado en la CH 818. La profundización de la rampa María Inés, permitirá acceder hacia los tajos ubicados en los niveles inferiores e iniciar la preparación para su posterior explotación. | es |
dc.description.abstract | The present study it’s about the restructuring of the entire pumping system of the Company Explotadora de Vinchos LTDA SAC, this study want to deepen the ramp María Inés, in 6 levels (equivalent to 120 vertical meters), and extract the mineral reserves that there are in this área. The pumping flow is 162 L / s, for a static height of 205 meters, which It will be carried out in two very different stretch but It are complementary sections that will work in series. In the first section, the pumping will be carried out with 5 submersible pumps BS 2400 HT, (4 working permanently and 1 in stand by). These will be put on in CA 846 S of Nv.3905 and It will drain the water to Lv.4005, a total of 100 meters of static height through 10 polyethylene pipes of 4 inches each one, installed in CH 818. This new pumping chamber will increase the performance and efficiency of submersible pumps, as well as their lifetime. In the second section, the pumping will be with 3 stationary pumps, with a capacity of 90 L / s, each one (2 working permanently and 1 in standby). These will be put on in the Nv. 4005, and will drain the water until to the surface, located in Nv. 4105, a total of 105 meters of static height. Water will rise through 2 steel pipes of 10 inches in diameter, installed in CH 818. The deepening of the ramp María Inés will allow access until the pits located in the lower levels and start the preparation for its subsequent exploitation. | en |
dc.description.uri | Tesis | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/restrictedAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Sistema de bombeo | es |
dc.subject | Reestructuración | es |
dc.subject | Rampa María Inés | es |
dc.title | Reestructuración del sistema de bombeo para la profundización de la rampa negativa María Inés. Empresa explotadora Vinchos | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero de Minas | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgica | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería de Minas | es |
thesis.degree.program | Ingeniería | es |
renati.advisor.orcid | https://orcid.org/0000-0003-0625-1495 | es |
renati.author.dni | 42243063 | - |
renati.advisor.dni | 07414011 | - |
renati.type | http://purl.org/pe-repo/renati/type#tesis | es |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es |
renati.discipline | 724026 | - |
renati.juror | Corimanya Mauricio, José Antonio | - |
dc.publisher.country | PE | es |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.07.05 | es |
Aparece en las colecciones: | Ingeniería de Minas |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
mejia_ar.pdf | 6,45 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por: