Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/19924
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Huayllasco Montalva, Carlos Alberto | - |
dc.contributor.author | Guerrero Calle, Joseph Fernando | - |
dc.creator | Guerrero Calle, Joseph Fernando | - |
dc.date.accessioned | 2021-03-02T18:43:20Z | - |
dc.date.available | 2021-03-02T18:43:20Z | - |
dc.date.issued | 2019 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/19924 | - |
dc.description.abstract | El año 2017, en el sector eléctrico de Piura se encontraba con dos problemas principales, entre ellas una fue el crecimiento de las demandas de la región para el año 2018, y además la afectación a las instalaciones eléctricas de transmisión por parte del Niño Costero. Los transformadores de potencia de la Subestación Piura Oeste de 220/60 kV, se encontraban con una sobrecarga de operación de aproximadamente el 20%, por lo que era imposible garantizar la continuidad del suministro eléctrico a los distintos usuarios que se interconectan mediante la subestación Piura Oeste. Por tanto, al detectar esta problemática el MEM junto con la empresa ISA REP, añadieron una cláusula adicional al Contrato de Concesión de Sistemas de Transmisión eléctrica, dando así al proyecto Ampliación N°19. Este proyecto se encuentra divididos en dos etapas, las cuales las denominan hito 01 e hito 02. Siendo el primer hito, la instalación de un transformador provisional en la SE Piura Oeste que permita suplir las cargas de la región norte, ello hasta la instalación del transformador definitivo cuya puesta en servicio se realizará hasta finales del 2019, siendo esta última etapa el hito 2 del proyecto. En el presente informe se describe las actividades que conllevaron hasta puesta en servicio del hito 1 del proyecto Ampliación N°19, en la cual se realizó trabajos sobre instalaciones existentes y energizadas, siendo la prioridad no afectar el suministro eléctrico de la región norte. | es |
dc.description.abstract | The year 2017, in Piura's power sector, is seen with the main problems, among them, it was based on the growth of the demands of the region for 2018, and also the impact on the transmission electrical installations by the Coastal Child The power transformers of the Piura Oeste substation of 220/60 kV, were found with an operating overload of approximately 20%, so it was impossible to obtain the power supply to the different users that are interconnected through the substation Piura West. Therefore, in order to detect this problem, MEM, together with the company REPA ISA, have added an additional clause to the Concession Contract for Electric Transmission Systems, as well as Expansion Project No. 19. This project is divided into two stages, which is called milestone 01 and milestone 02. Being the first milestone, the installation of a provisional transformer in the SE Piura West that can supply the loads of the northern region, as well as the installation of the definitive transformer. This report describes the activities that led to the start-up in service 1 of the Expansion N ° 19 project, in which work is carried out on existing and energized facilities, the priority being that it does not affect the electricity supply of the northern region. | en |
dc.description.uri | Trabajo de suficiencia profesional | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/restrictedAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Sistema eléctrico | es |
dc.subject | Deficiencia energética | es |
dc.title | Solución a la deficiencia energética del sistema eléctrico de Piura mediante la instalación provisional del transformador de potencia 220/60/10 kV 50 MVA en la subestación Piura Oeste | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero Electricista | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Eléctrica y Electrónica | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería Eléctrica | es |
thesis.degree.program | Ingeniería | es |
renati.advisor.orcid | https://orcid.org/0000-0002-3335-0926 | es |
renati.author.dni | 46606127 | - |
renati.advisor.dni | 25600262 | - |
renati.type | http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es |
renati.discipline | 711046 | - |
renati.juror | Domínguez Fretel, Gerardo | - |
dc.publisher.country | PE | es |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.02.01 | es |
Aparece en las colecciones: | Ingeniería Electrica |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
guerrero_cj.pdf | 16,09 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por: