Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/19927
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Tisza Contreras, Juan Francisco | - |
dc.contributor.author | Donayre Contreras, Sergio Martín | - |
dc.creator | Donayre Contreras, Sergio Martín | - |
dc.date.accessioned | 2021-03-02T20:29:35Z | - |
dc.date.available | 2021-03-02T20:29:35Z | - |
dc.date.issued | 2019 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/19927 | - |
dc.description.abstract | En este trabajo se definen las características del sistema de control y telecomunicaciones de la nueva subestación Paita Industrial en Piura a nivel de ingeniería definitiva, nivel requerido para la construcción del proyecto y que incluye la interconexión al sistema SCADA de ENOSA, empresa encargada de la ejecución del proyecto. La construcción de la subestación Paita Industrial ha sido aprobado en el plan de inversiones de transmisión 2017-2021 y este trabajo forma parte del estudio definitivo del proyecto, estudio necesario para la construcción del proyecto y desarrollado por la empresa PRICONSA en base a las normas, estándares y procedimientos vigentes. En este trabajo se describe de manera general los alcances del equipamiento a implementar en la nueva subestación, luego se definen los elementos que se van a integrar al sistema de control y telecomunicaciones y las características de dicho sistema y de su conexión con las subestaciones adyacentes existentes (subestación Paita y la central térmica El Tablazo). Finalmente, se determinan los equipos a implementarse en cada subestación y que puedan realizar las funciones del sistema que se busca implementar, se definirán sus características técnicas y las consideraciones para su instalación. Luego se definen los costos y cronograma de ejecución del proyecto y para complementar, se presentan las cartas de conformidad del estudio definitivo y estudio de pre operatividad del proyecto y el cálculo de cantidad de señales previstas a integrarse. | es |
dc.description.abstract | This work defines the characteristics of the control and telecommunications system of the new Paita Industrial substation in Piura at definitive engineering level, level required to execute the construction of the project, which includes the interconnection to the ENOSA SCADA system, a company in charge of the execution of the project. The construction of the Paita Industrial substation has been approved in the investment planning of transmission (2017-2021) and this work is part of the definitive study of the project, a necessary study for the project construction, and developed by PRICONSA, following the norms, standards and active procedures. This work contains an overview of the scope of the equipment to be implemented in the new substation, then the elements that will be integrated into the control and telecommunications system will be defined, as well as the characteristics of such system and its connection to the existing adjacent substations (Paita substation and the El Tablazo thermal power plant). Finally, the equipment to be implemented in each substation will be determined and it will be verified that the functions of the system are working properly; furthermore, its technical characteristics and considerations for its installation will be defined. The costs and schedule for the execution of the project will then be defined, and the letters of agreement of definitive study, as well as the pre-operation study of the project, and the calculation of the number of signals planned to be integrated will be presented. | en |
dc.description.uri | Trabajo de suficiencia profesional | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/restrictedAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Sistema de control y telecomunicaciones | es |
dc.subject | Subestación | es |
dc.title | Estudio definitivo para la integración de la nueva subestación Paita industrial al sistema Scada de Enosa, departamento de Piura | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero Electrónico | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Eléctrica y Electrónica | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería Electrónica | es |
thesis.degree.program | Ingeniería | es |
renati.advisor.orcid | https://orcid.org/0000-0003-2548-2686 | es |
renati.author.dni | 46366250 | - |
renati.advisor.dni | 08596442 | - |
renati.type | http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es |
renati.discipline | 712026 | - |
renati.juror | Peralta Alférez, Frans Vily | - |
dc.publisher.country | PE | es |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.02.01 | es |
Aparece en las colecciones: | Ingeniería Electrónica |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
donayre_cs.pdf | 3,02 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por: