Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/20550
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Ulloa Velásquez, Félix Wilfredo | - |
dc.contributor.author | Guzman Ganto, Giankeving Isaac | - |
dc.creator | Guzman Ganto, Giankeving Isaac | - |
dc.date.accessioned | 2021-06-16T21:45:01Z | - |
dc.date.available | 2021-06-16T21:45:01Z | - |
dc.date.issued | 2019 | - |
dc.identifier.uri | https://repositorio.uni.edu.pe/handle/20.500.14076/20550 | - |
dc.description.abstract | La etapa de Operación y Mantenimiento es la fase más larga y costosa durante el ciclo de vida de una edificación; representa el 80% del total de los costos en el ciclo de vida. La información producida en la etapa de construcción es perdida en la etapa de Operación y Mantenimiento, dicha información son documentos aún basados en papel (planos, manuales, protocolos, etc.) La tesis presenta el estudio de la aplicación de herramientas y tecnologías BIM en la gestión de Operación y Mantenimiento del recinto deportivo Centro Acuático de la Villa Deportiva Nacional (Videna). En el desarrollo se muestra el marco teórico de la gestión de Mantenimiento, niveles de desarrollo BIM, el concepto de Facility Management y los estándares de intercambio de información desde la construcción hacia la O&M. El caso de estudio es uno de los proyectos principales para los Juegos Panamericanos y Parapanamericanos Lima 2019 que fue ejecutado bajo nuevos enfoques de colaboración e integración potenciando el uso de la metodología BIM desde la fase de diseño y construcción. Como resultado de este proceso se consiguió modelos As-Built que se actualizaron de manera eficiente mediante el escáner laser 3D y la integración de la nube de puntos con el software de modelado. En el último capítulo refiere a la parametrización del modelo BIM para la generación del archivo COBie y su respectivo control de calidad para evitar errores en la carga de datos a la plataforma BIM-FM. Luego de ello se proceder a subir la información de los planes de mantenimiento del sistema HVAC y el sistema de piscinas a la plataforma de mantenimiento YouBIM basado en la nube. Producto de la implementación BIM 7D en obra se extrae flujos de trabajo tradicionales en las actividades de mantenimiento y se logra realizar nuevos flujos basado en las herramientas BIM, como la generación de Órdenes de Trabajo mediante YouBIM. De la misma manera se plantea el soporte visual de los modelos de información en el conjunto de capacitaciones que se le hizo al staff de mantenimiento del Instituto Peruano del Deporte, con el fin de mejorar el entendimiento de las nuevas infraestructuras y promover una participación activa en las sesiones. En el proceso de la implementación en obra se recolecto información sobre los incidente o fallas de los equipos, analizando que con el uso de herramientas BIM se podría disminuir los tiempos de ejecución de Órdenes de Trabajo y elevar la eficiencia laboral por un mejor acceso a la información de los equipos y/o sistemas. Finalmente se elaboró una encuesta a un grupo de profesionales de mantenimiento en el PostGrado de la Universidad Nacional de Ingeniería donde el 64% usan algún GMAOT para el mantenimiento, sin embargo, el 86% no conoce la metodología BIM. | es |
dc.description.abstract | The Operation and Maintenance stage is the longest and most expensive phase during the life cycle of a building; It represents 80% of the total costs in the life cycle. The information produced in the construction stage is lost in the Operation and Maintenance stage, such information is still paper-based documents (plans, manuals, protocols, etc.). The thesis presents the study of the application of BIM tools and technologies in the Operation and Maintenance management of the Aquatic Center of the Villa Deportiva Nacional (Videna). The development shows the theoretical framework of Maintenance management, BIM development levels, the concept of Facility Management and the standards of information exchange from construction to O&M. The case study is one of the main projects for the Lima 2019 Pan American and Parapan American Games that was executed under new approaches to collaboration and integration, promoting the use of the BIM methodology from the design and construction phase. As a result of this process, As-Built models were achieved that were efficiently updated using the 3D laser scanner and the integration of the point cloud with the modeling software. In the last chapter, it refers to the parameterization of the BIM model for the generation of the COBie file and its respective quality control to avoid errors in loading data to the BIM-FM platform. After that, we proceed to upload the information on the maintenance plans of the HVAC system and the pool system to the cloud-based YouBIM maintenance platform. As a result of the BIM 7D implementation on-site, traditional workflows are extracted in maintenance activities and new flows are made based on BIM tools, such as the generation of Work Orders through YouBIM. In the same way, the visual support of the information models in the set of trainings that was made to the maintenance staff of the Peruvian Sports Institute was proposed, to improve the understanding of the new infrastructures and promote active participation in the sessions. In the process of implementation on site, information about the incidents or failures of the equipment was collected, analyzing that with the use of BIM tools, the execution times of Work Orders could be reduced and work efficiency increased by better access to the information of the equipment and / or systems. Finally, a survey of a group of maintenance professionals in the Post-Degree of the National Engineering University was prepared, where 64% use some GMAOT for maintenance, however, 86% do not know the BIM methodology. | en |
dc.description.uri | Tesis | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/openAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Software BIM | es |
dc.subject | Gestión de operaciones | es |
dc.subject | Plan de mantenimiento | es |
dc.title | Aplicación de herramientas y tecnología BIM en la mejora de la gestión de operación y mantenimiento de una infraestructura deportiva | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero Civil | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Civil | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería Civil | es |
thesis.degree.program | Ingeniería | es |
renati.author.dni | 70573745 | - |
renati.advisor.dni | 07227448 | - |
renati.type | http://purl.org/pe-repo/renati/type#tesis | es |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es |
renati.discipline | 732016 | - |
renati.juror | Arrieta Freyre, Javier Eduardo | - |
dc.publisher.country | PE | es |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.01.01 | es |
Aparece en las colecciones: | Ingeniería Civil |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
guzman_gg.pdf | 15,09 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por: