Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/20768
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Brañes Gallardo, Henry Diomedes | - |
dc.contributor.author | Silva Hernandez, Ney Lisset | - |
dc.creator | Silva Hernandez, Ney Lisset | - |
dc.date.accessioned | 2021-08-02T19:40:55Z | - |
dc.date.available | 2021-08-02T19:40:55Z | - |
dc.date.issued | 2020 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/20768 | - |
dc.description.abstract | El presente trabajo de tesis corresponde a una evaluación de estrategias de minado para incrementar la producción de libras de cobre, en la etapa de planificación a corto plazo en una mina al sur del Perú. La información publicada en esta tesis, específicamente en los resultados obtenidos no corresponden a la realidad de la operación minera. La operación minera se desarrolla en dos tajos, la investigación de la tesis se enfoca en el tajo San José que cuenta con dos fases de minado, fase San José 6 ubicada en los niveles superiores del tajo en una etapa de desbroce y la fase San José 5 ubicada en los niveles inferiores del tajo siendo la fase con más alta ley y mejor recuperación de concentrado de la mina. Con el avance de minado del tajo San José, surgió la condición de interferencia de fases, cuando se estaba minado fase San José 6 caía material a la rampa de acceso a fase San José 5. Hasta que quedó bloqueado el ingreso a fase San José 5 por caída de material, causando pérdidas a la empresa. El propósito principal de la tesis es implementar el plan de minado considerando el minado en fase San José 5, la metodología de investigación es científica basado en un enfoque cuantitativo y aplicada en la operación minera. La población está conformada por casos de plan de minado considerando diferentes estrategias de minado y movimiento de equipos de carguío. Finalmente, se concluye que la implementación del plan de minado en fases interferidas incrementa la producción del concentrado de cobre en la operación minera. | es |
dc.description.abstract | This thesis work corresponds to an evaluation of mining strategies to increase the production of pounds of copper, in the short-term planning stage in a mine in southern Peru. The information published in this thesis, specifically in the results obtained, does not correspond to the reality of the mining operation. The mining operation is carried out in two pitches, the thesis research focuses on the San José pit that has two mining phases, San José 6 phase located in the upper levels of the pit in a clearing stage and the San José phase 5 located in the lower levels of the pit, being the phase with the highest grade and best recovery of mine concentrate. With the advance of mining of the San José pit, the condition of phase interference arose, when San José phase 6 was mined material fell to the access ramp to San José phase 5. Until the entrance to San José phase 5 was blocked by fall of material, causing losses to the company. The main purpose of the thesis is to implement the mining plan considering the mining phase San José 5, the research methodology is scientific based on a quantitative approach and applied in the mining operation. The population is made up of mining plan cases considering different mining strategies and movement of loading equipment. Finally, it is concluded that the implementation of the mining plan in interfered phases increases the production of the copper concentrate in the mining operation. | en |
dc.description.uri | Trabajo de suficiencia profesional | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/restrictedAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Estrategias de minado | es |
dc.subject | Fases interferidas | es |
dc.subject | Concentrado de cobre | es |
dc.title | Implementación de estrategias de minado para incrementar producción en mina a tajo abierto | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero de Minas | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgica | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería de Minas | es |
thesis.degree.program | Ingeniería | es |
renati.author.dni | 44122066 | - |
renati.advisor.dni | 06601901 | - |
renati.type | http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es |
renati.discipline | 724026 | - |
renati.juror | Corimanya Mauricio, José Antonio | - |
renati.juror | Agreda Turriate, Isauro Carlos | - |
dc.publisher.country | PE | es |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.07.05 | es |
Aparece en las colecciones: | Ingeniería de Minas |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
silva_hn.pdf | 4,88 MB | Adobe PDF | Visualizar/Abrir | |
silva_hn(acta).pdf | 93,43 kB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por: