Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/2094
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorMatos Ávalos, Carmen Rosalía-
dc.contributor.authorCabrera Aquije, Milthon Gerardo-
dc.creatorCabrera Aquije, Milthon Gerardo-
dc.date.accessioned2016-09-13T00:25:13Z-
dc.date.available2016-09-13T00:25:13Z-
dc.date.issued2015-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/2094-
dc.description.abstractEl criterio de selección del tajo final fue aquella envolvente que arroja el mejor valor presente neto (VPN) en función de precios de mineral, costos operativos, costos de procesamiento, recuperación, tasa de retorno, entre otros factores. En base a los resultados se logró determinar tres etapas de explotación para el yacimiento denominado Pit Checocollo y una sola fase para el yacimiento Morrenas. Los recursos y reservas obtenidos en función a los parámetros económicos utilizados y al proceso de optimización antes descrito indican que la mina Pucamarca tiene en cuanto a recursos un total de 66,6 Mt de mineral por encima de la ley de corte, en cuanto a las reservas por encima de la ley de corte se tiene un total de 46,5 Mt de mineral entre probadas y probables y 11,4 Mt de recursos inferidos dentro del pit final diseñado. Los resultados de los recursos considerados totalizan para el yacimiento Checocollo 54 Mt de mineral por encima de una ley de corte igual a 0,18 g/t entre recursos medidos, indicados e inferidos, en cuanto al yacimiento Morrenas los recursos alcanzan 8,3 Mt de mineral encima de una ley de corte de 0,2 g/t los resultados metalúrgicos indican que este sector tiene una recuperación de 50% mediante el método de lixiviación muy por debajo de la recuperación obtenida en el yacimiento Checocollo que alcanza un 65% de recuperación. Los resultados de la planificación minera determinan tres etapas de explotación para el tajo Checocollo la primera de tres años con las mejores leyes y el menor ratio de desmonte, la segunda también de tres años alcanzado una extracción del 80% del total del tajo final y la ultima de 2,5 años con leyes inferiores a las anteriormente extraídas culminando en el año 2022. Para el tajo Morrenas su explotación solo se realizará una fase y la vida útil será de 4 años, debido a ser un mineral con alto contenido de finos se han tomado las consideraciones geotécnicas y metalúrgicas. La secuencia de explotación y la estimación de costos operativos y de inversión necesarios para la sostenibilidad de la unidad minera Pucamarca determinan que el valor presente neto de la unidad alcanza los US$235 (millones de dólares americanos) considerando una inversión inicial de US$200 (millones de dólares americanos) aproximadamente, bajo estos resultados el plan de minado propuesto resulta viable para los interés del grupo BRECA.es
dc.description.abstractThe selection criterion was the final pit envelope that had the best net present value. Based on the results it was determined three stages of operation for the site called Pit Checocollo and one phase to the site Morrenas. Reserves and resources obtained according to economic parameters used and the optimization process described above indicate that the mine has Pucamarca for resources totaling 66.6 Mt of ore above the cutoff, as to the reserves above the cutoff will have a total of 46.5 Mt of proven and probable ore between and 11.4 Mt of inferred resources within the designed ultimate pit. The results of resources are considered for the site Checocollo 54 Mt of ore above a cutoff equal to 0.18 g/t between measured, indicated and inferred resources, in terms of site Morrenas resources are 8.3 Mt mineral above a cutoff grade of 0.2 g/t metallurgical results indicate that this sector has a 50% recovery by leaching method well below the recovery obtained in the field Checocollo reaching 65% recovery. The results of the mine planning identify three stages Checocollo pit exploitation for the first three years with better grades and lower stripping ratio, the second of three years also reached an extraction of 80% of total final pit and last 2.5 years lower than those previously extracted culminating in the year 2022. For Morrenas pit exploitation will take place just a phase and the lifetime is 4 years due to being a high ore fines are taken geotechnical and metallurgical considerations. The sequence of operation and estimates of operating and investment costs necessary for the sustainability of the mining unit Pucamarca determine the net present value of the unit is US $ 235 (million dollars) considering an initial investment of US $ 200 (million US dollars) about these results under the proposed mining plan feasible for BRECA interest group, value much higher than those obtained in previous studies. This meets the objective of this document.en
dc.description.uriTesises
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectMinadoes
dc.subjectOperaciones minerases
dc.subjectEstimación de recursoses
dc.titlePlanificación minera en mina Pucamarca de Minsur S.A.es
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero de Minases
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgicaes
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería de Minases
thesis.degree.programIngenieríaes
Aparece en las colecciones: Ingeniería de Minas

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
cabrera_am.pdf2,23 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons