Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/22115
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorChávez Valdivia, Adolfo Jesús-
dc.contributor.authorAchahue Flores, Danny Manuel-
dc.creatorAchahue Flores, Danny Manuel-
dc.date.accessioned2022-05-19T19:15:05Z-
dc.date.available2022-05-19T19:15:05Z-
dc.date.issued2021-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/22115-
dc.description.abstractEl proyecto para explotar con el método tajeos por subniveles, fue planteado por la necesidad de mejorar la baja productividad y altos costos, así como disminuir el índice de accidentabilidad por manipuleo de la madera, el cual representaba la más alta tasa dentro de los accidentes leves e incapacitantes. El análisis del proyecto fue realizado en el 2015 en Minera aurífera RETAMAS, donde se explota el mineral con métodos convencionales y mecanizados, como el corte y relleno ascendente con Jack leg y winches, y el corte y relleno Ascendente con jumbo y scoop respectivamente. Es así que en el nivel 2670 se cortó la veta Daniela con buzamiento de 60°, rumbo N14°W y potencia aproximada de 1.4 metros proyectándose el minado de manera convencional. Ante las necesidades descritas de aumentar el tonelaje, de reducir costos y aumentar la seguridad, se propuso desarrollar el “análisis técnico económico para explotar con el método tajeo por subniveles la veta angosta Daniela T680-Marsa.” El estudio geológico indicó que no existían fallas relevantes dentro del largo de la mineralización, el estudio geomecánico mostró que existían 3 Familias principales de discontinuidades: Familia 1 58/149, Familia 2 59/285 y Familia 3 75/25 siendo esta ultima la más desfavorable a la excavación. La caracterización del Macizo Rocoso dio como resultado un GSI de 51 para las cajas y 43 para la veta; regulares y aptos para aplicar el método. Los esfuerzos inducidos en las paredes finales de la excavación fueron 9.67 MPa para la caja piso y 5.50 MPa para la caja techo, en la corona del subnivel superior y en veta fue 118 MPa, todo ello en conjunto con el número de estabilidad de 11.75 y radio hidráulico 4.73 indicaron la estabilidad del tajeo hasta 40 m. Así por último el Factor de seguridad fue de 1.06 corroborando la estabilidad, pero indicando el pronto relleno. El análisis de las vibraciones para una distancia de 12 metros donde se encuentra el BP 10192-S no generó daño alguno, ya que se obtuvo una PPV de 126.9 mm/s estando por debajo al límite de extensión de fracturas (275mm/s). La eficiencia del método tajeo por subniveles es 20.25 TMS/H-Gdia frente a los 3.9TMS/ H-Gdia del corte y relleno convencional. El Cash cost para el cambio de método trae un ahorro de 10.25 US$/ONZ para la unidad minera. Siendo más rentable explotar por el método tajeo por subniveles que por el método corte y relleno convencional. El costo de operación del método tajeo por subniveles fue $/17.84/TMS y del corte y relleno convencional $/38.63/TMS, con valor de mineral de $/332.18/TMS y $/348.45/TMS respectivamente; resultando el análisis de costos del método tajeos por subniveles frente al corte y relleno convencional en un ahorro de $/1 147 814.62 para 9 meses de explotación. Se dejará de consumir 2’ 886 592.4 Kg de madera eucalipto con el cambio de método. Este Análisis técnico económico positivo determinó la factibilidad para implementar el método propuesto “Tajeo por subniveles en la veta angosta Daniela”es
dc.description.abstractThe project to develop with the sublevel stoping method was raised due to the need to improve low productivity and high costs, as well as reduce the accident rate due to wood handling, which represented the highest rate in minor accidents and disabling. The analysis of the project was carried out in 2015 at RETAMAS gold mine, where the ore is exploited with conventional and mechanized methods, cut and fill with Jack leg and winch, and Ascendant cut and fill with jumbo and scoop respectively. Thus, at level 2670, the Daniela strike was cut with a 60 ° dip, heading N14 ° W and approximate strength of 1.4 meters, projecting the mining in a conventional manner. Given the described needs to increase tonnage, reduce costs and increase safety, it was proposed to develop the “economic technical analysis to exploit the strike Daniela T680-Marsa using the sublevel stoping method.” The geological study indicated that there were no failures Relevant within the length of the mineralization, the geomechanical study showed that there were 3 main families of discontinuities: Family 1 58/149, Family 2 59/285 and Family 3 75/25, the latter being the most unfavorable to excavation. The characterization of the Rock Mass resulted in a GSI of 51 for the end walls and 43 for the strike; regular and fit to apply the method. The strenght induced in the end walls of the excavation were 9.67 MPa for the floor box and 5.50 MPa for the roof box, in the crown of the upper sublevel and vein was 118 MPa, all in conjunction with the stability number of 11.75 and 4.73 hydraulic radius indicated the stability of the cutting up to 40 m. Thus, the Safety Factor was 1.06 corroborating the stability but indicating the soon filling. The analysis of the vibrations for a distance of 12 meters where the BP 10192-S is located did not generate any damage, since a PPV of 126.9 mm / s was obtained being below the fracture extension limit (275mm / s). The efficiency of the sub-level tacking method is 20.25 TMS / H-Gdia compared to the 3.9TMS / H-Gdia of conventional cutting and filling. The Cash cost for the change of method brings a saving of 10.25 US $ / ONZ for the mining unit. It is more profitable to exploit by the sub-level chopping method than by the conventional cut and fill method. The operating cost of the pitting method by sublevels was $ / 17.84 / TMS and of the conventional cut and fill $ / 38.63 / TMS, with ore value of $ / 332.18 / TMS and $ / 348.45 / TMS respectively; The cost analysis of the sub-level chopping method compared to conventional cutting and filling resulted in a saving of $ / 1, 147,814.62 for 9 months of exploitation. 2 '886 592.4 Kg of eucalyptus wood will no longer be consumed with the change in method. This positive technical economic analysis determined the feasibility to implement the proposed method "Tajeo by sublevels in the narrow vein Daniela"en
dc.description.uriTesises
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/restrictedAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectMinera Aurífera Retamas S.A.es
dc.subjectVetas angostases
dc.subjectMineríaes
dc.titleAnálisis técnico económico para explotar con el método tajeo por subniveles la veta angosta Daniela T-680 - MARSAes
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero de Minases
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgicaes
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería de Minases
thesis.degree.programIngenieríaes
renati.advisor.orcidhttps://orcid.org/0000-0003-0625-1495es
renati.author.dni42947712-
renati.advisor.dni07414011-
renati.typehttp://purl.org/pe-repo/renati/type#tesises
renati.levelhttp://purl.org/pe-repo/renati/nivel#tituloProfesionales
renati.discipline724026-
renati.jurorValverde Espinoza, Santiago Gualberto-
renati.jurorCorimanya Mauricio, José Antonio-
dc.publisher.countryPEes
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.07.05es
Aparece en las colecciones: Ingeniería de Minas

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
achahue_fd.pdf7,11 MBAdobe PDFVisualizar/Abrir
achahue_fd(acta).pdf110,8 kBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI