Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/22437
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Condori Cupi, Carmelo | - |
dc.contributor.author | Quispe Silva, Leonardo Anibal | - |
dc.creator | Quispe Silva, Leonardo Anibal | - |
dc.date.accessioned | 2022-07-21T22:04:11Z | - |
dc.date.available | 2022-07-21T22:04:11Z | - |
dc.date.issued | 2022 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/22437 | - |
dc.description.abstract | El plan de producción anual es una forma de contrato entre una mina y las partes interesadas (accionistas, propietarios, socios) cuyo cumplimiento asegura el retorno de la inversión minera. Uno de los problemas que afectan al negocio minero es la desviación del plan de producción y los resultados de la operación, lo cual se ve reflejado en bajos niveles de cumplimiento y adherencia. El incremento de la adherencia del plan de producción es importante porque permite controlar el estado económico de la mina a largo plazo, garantizando la seguridad y entregando planes de producción claros y alcanzables. La presente investigación estudia la relación de la adherencia del plan de producción mina con la metodología de planificación. Se realizo una investigación con enfoque cuantitativo, alcance correlacional y de diseño experimental. Los datos utilizados en el análisis corresponden a los valores de adherencia y cumplimiento del plan de producción anual de una mina subterránea mecanizada, de ancho de veta variable (3 – 20 metros), que realiza la explotación del yacimiento por el método Sub Level Stoping a un ritmo de producción de 1500 tpd. El plan de producción anual para el periodo 2018 se elaboró un 33% con la metodología de planificación manual o tradicional mientras que en el periodo 2019 se utilizó la metodología de planificación con herramientas computacionales al 100% en todas las etapas de planificación. El estudio concluye que la adherencia del plan de producción del periodo 2019 es mayor al obtenido en el periodo 2018. | es |
dc.description.abstract | The annual production plan is a form of contract between a mine and the stakeholders (shareholders, owners, partners) whose fulfillment ensures the return of the mining investment. One of the problems that affect the mining business is the deviation from the production plan and the results of the operation, which is reflected in low levels of compliance and adherence. The increase in adherence to the production plan is important because it enables the long-term economic status of the mine to be controlled, guaranteeing safety, and delivering clear and achievable production plans. This research studies the relationship of adherence to the mine production plan with the planning methodology. An investigation was carried out with a quantitative approach, correlational scope, and experimental design. The data used in the analysis correspond to the adherence and compliance values of the annual production plan of a mechanized underground mine, with a variable vein width (3 - 20 meters), which exploits the deposit by the Sub Level Stoping method with a production rate of 1500 tpd. The annual production plan for the 2018 period was prepared 33% with the manual or traditional planning methodology, while in the 2019 period the planning methodology with 100% computational tools was used in all planning stages. The study concludes that adherence to the production plan for the 2019 period is higher than that obtained in the 2018 period. | en |
dc.description.uri | Trabajo de suficiencia profesional | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/openAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Adherencia | es |
dc.subject | Plan de producción | es |
dc.subject | Secuenciamiento | es |
dc.subject | Software de planificación | es |
dc.title | Mejora de la adherencia del plan de producción mina empleando metodología de planificación con herramientas computacionales | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero de Minas | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgica | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería de Minas | es |
thesis.degree.program | Ingeniería | es |
renati.advisor.orcid | https://orcid.org/0009-0001-9948-1689 | es |
renati.author.dni | 43923886 | - |
renati.advisor.dni | 06914894 | - |
renati.type | http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es |
renati.discipline | 724026 | - |
renati.juror | Corimanya Mauricio, José Antonio | - |
renati.juror | Salazar Dulanto, Eder León | - |
dc.publisher.country | PE | es |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.07.05 | es |
Aparece en las colecciones: | Ingeniería de Minas |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
quispe_sl.pdf | 2,03 MB | Adobe PDF | Visualizar/Abrir | |
quispe_sl(acta).pdf | 76,22 kB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por: