Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/22787
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorCorimanya Mauricio, José Antonio-
dc.contributor.authorRojas Ramirez, Lenin-
dc.creatorRojas Ramirez, Lenin-
dc.date.accessioned2022-10-04T21:15:18Z-
dc.date.available2022-10-04T21:15:18Z-
dc.date.issued2022-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/22787-
dc.description.abstractEl trabajo de suficiencia laboral titulado: “Desarrollo del plan de minado de corto plazo eficiente y operativo en una operación minera a tajo abierto”, tiene como objetivo mostrar el desarrollo de un plan de minado a corto plazo el cual a su vez sea eficiente y operativo en una operación minera de Tajo abierto con la finalidad de llegar a las metas trazadas tanto de tonelaje y ley de mena. En esta estrategia de minado, se indicará lo que se debe tener en cuenta al momento de elaborar un plan de minado para que se puede realizar en campo y obtener los valores planeados, además se mostrará las diferentes variables o consideraciones que influyen directamente en el desarrollo del plan de minado, el cual no considerarlos disminuirá la probabilidad de alcanzar los objetivos planteados. La metodología usada para desarrollar el trabajo es la descriptiva, ya que se describe uno por uno el proceso de producción de operaciones minas que influyen en el desarrollo del plan de minado, complementado con el análisis y la estadística de cada proceso productivo para así ver su inferencia en el desarrollo del plan de minado. En este trabajo no se entra a fondo al tema de la voladura, cálculo de camiones, obtención de leyes y clasificación de materiales a minar. Pero se explica superficialmente y se muestra lo importante que es considerar dentro de los planes de minado y las implicancias que se tiene de no tener los valores correctos. Al final del trabajo se concluye que lo más importante en desarrollar un plan de minado es simular de manera correcta lo que van a minar los equipos de carguío y conocer de manera más cierta nuestras leyes y tipo de material a minar. Esto nos permitiría cumplir los tonelajes y leyes planteadas.es
dc.description.abstractThe labor adequacy work entitled: "Development of an efficient and operative short- term mining plan in an open-pit mining operation", aims to show the development of a short-term mining plan which in turn is efficient and operating in an open pit mining operation in order to reach the goals set for both tonnage and grade. In this mining strategy, it will indicate what must be taken into account when preparing a mining plan so that it can be carried out in the field and obtain the planned values, in addition, it will show the different variables or considerations that directly influence the development of the mining plan, which not considering them will decrease the probability of reaching the proposed objectives. The methodology used to develop the work is descriptive, as it describes one by one the process of mining operations that influence the development of the mining plan, complemented with the analysis and statistics of each production process in order to see its inference in the development of the mining plan. This work does not go in depth into the subject of blasting, calculating trucks, obtaining grades and classifying materials to be mined. But it is explained superficially and shows how important it is to consider in mining plans and the implications of not having the correct values. At the end of this work, it is concluded that the most important thing in developing a mining plan is to correctly simulate what the loading equipment is going to mine and to know more accurately our laws and type of material to be mined. This would allow us to comply with the tonnages and laws proposed.en
dc.description.uriTrabajo de suficiencia profesionales
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectPlan de minado a corto plazoes
dc.subjectEstrategia de minado y tajo abiertoes
dc.titleDesarrollo del plan de minado de corto plazo eficiente y operativo en una operación minera a tajo abiertoes
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero de Minases
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgicaes
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería de Minases
thesis.degree.programIngenieríaes
renati.advisor.orcidhttps://orcid.org/0000-0003-1078-4155es
renati.author.dni46786481-
renati.advisor.dni08079590-
renati.typehttp://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesionales
renati.levelhttp://purl.org/pe-repo/renati/nivel#tituloProfesionales
renati.discipline724026-
renati.jurorLandauro Abanto, Alberto-
renati.jurorHernández Díaz, Víctor Manuel-
dc.publisher.countryPEes
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.07.05es
Aparece en las colecciones: Ingeniería de Minas

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
rojas_rl.pdf2,22 MBAdobe PDFVisualizar/Abrir
rojas_rl(acta).pdf78,67 kBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI