Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/23008
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorPalma García, Modesto Tomás-
dc.contributor.authorFernández Herrera, Juan-
dc.creatorFernández Herrera, Juan-
dc.date.accessioned2022-12-27T22:07:57Z-
dc.date.available2022-12-27T22:07:57Z-
dc.date.issued2021-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/23008-
dc.description.abstractLa SE El Hierro alimenta la nueva planta beneficio de la minera Shougang (56MW) y a la minera Shouxin (19MW). De acuerdo con el programa del COES, cuando se realiza el mantenimiento programado en los equipos del SEIN en el área de influencia de la SE Hierro, los usuarios libres, aquellos que se alimentan de la barra de Marcona, deben poner en operación bancos de condensadores para que la tensión en la barra de Marcona 220kV esté dentro de los parámetros admisibles. Dado que los bancos de condensadores que se encuentran en la SE Hierro no están operativos, el COES solicita a Shougang que en la SE El Hierro se reduzca su carga; situación que puede perjudicar enormemente la producción de mineral. Con el uso del software Digsilent se realizó las simulaciones de flujo de carga en estado estacionario y en contingencia, con el fin de evaluar el comportamiento de los bancos de condensadores de la SE Hierro. Cabe aclarar que, para este análisis, se simuló con bancos y sin bancos de condensadores. Sumado a esto, también se llevó a cabo el cálculo de corto circuito y se llevó a cabo el análisis de los armónicos de voltaje y corriente para verificar su comportamiento en la red cuando ingresan los bancos de condensadores a la SE Hierro. Se comprobó que, ante alguna contingencia en el SEIN, la inoperatividad de los bancos de condensadores obliga a la nueva planta a reducir su carga a menos de la mitad e, incluso, llegar a desconectar las instalaciones. Se verificó que, al poner en operación los bancos de condensadores cuando se presentan las contingencias, la planta puede funcionar a plena carga.es
dc.description.abstractThe SE El Hierro feeds the new Beneficio plant of the Shougang mining company (56MW) and the Shouxin mining company (19MW). When scheduled maintenance is carried out on SEIN equipment in the area of influence of SE Hierro, according to the COES program, free users (who are powered by the Marcona bus) must put into operation capacitor banks so that the voltage in the 220kV Marcona bus is within the admissible parameters. Since the capacitor banks in SE Hierro are not operational, the COES requests Shougang to reduce their load in SE El Hierro, which greatly impairs its mineral production. Using the Digsilent software, the steady-state and contingency load flow simulations were performed to evaluate the behavior of the capacitor banks of the SE Hierro, it was simulated with banks and without capacitor banks. In addition, the short c ircuit calculation was carried out and an analysis of the voltage and current harmonics was also made to verify their behavior in the network when the capacitor banks enter. It was found that, in the face of some contingency in the SEIN, the inoperability of the capacitor banks forces the new Plant to reduce its load to less than half and even to disconnect the facilities. It was verified that by putting the capacitor banks into operation, when contingencies arise, the plant can operate at full load.en
dc.description.uriTrabajo de suficiencia profesionales
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/restrictedAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectBanco de condensadoreses
dc.subjectEvaluación de operaciónes
dc.subjectProducción de hierroes
dc.subjectPlanta mineraes
dc.subjectMinera Shouxines
dc.subjectMinera Shouganges
dc.titleEvaluación de operación de los bancos de condensadores de la SSEE el hierro para mejorar la carga de producción de planta mineraes
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero Electricistaes
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Eléctrica y Electrónicaes
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería Eléctricaes
thesis.degree.programIngenieríaes
renati.advisor.orcidhttps://orcid.org/0009-0005-1371-7988es
renati.author.dni41862121-
renati.advisor.dni06863348-
renati.typehttp://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesionales
renati.levelhttp://purl.org/pe-repo/renati/nivel#tituloProfesionales
renati.discipline711046-
renati.jurorVelazco Lorenzo, Dinau-
renati.jurorRosado Aguirre, Estanislao Ubaldo-
dc.publisher.countryPEes
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.02.01es
Aparece en las colecciones: Ingeniería Electrica

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
fernandez_hj.pdf4,36 MBAdobe PDFVisualizar/Abrir
informe_de_similitud.pdf116,2 kBAdobe PDFVisualizar/Abrir
fernandez_hj(acta).pdf100,42 kBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI