Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/23214
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Huayllasco Montalva, Carlos Alberto | - |
dc.contributor.author | Soto Palomino, Aaron Edwin | - |
dc.creator | Soto Palomino, Aaron Edwin | - |
dc.date.accessioned | 2023-01-23T23:36:36Z | - |
dc.date.available | 2023-01-23T23:36:36Z | - |
dc.date.issued | 2021 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/23214 | - |
dc.description.abstract | En el presente Informe de Suficiencia Profesional se dará a conocer los aspectos técnicos para la modernización de las instalaciones y subestaciones de distribución de Media Tensión para un Instituto de Educación Técnica Superior. Se indica los lineamientos del Proyecto de modernización, desde el alimentador eléctrico y redes de distribución, el sistema de protección y coordinación, los equipos de energía, la seguridad y confiabilidad del sistema. Se plantea la problemática presente del nivel de tensión 10 kV en instalaciones de la década del 60-70, las políticas del Concesionario de distribución de energía eléctrica, así como los temas relacionados a la seguridad y confiabilidad, que tienen una trascendencia legal. Este Proyecto no solamente describe la solución a esta problemática, sino que da a conocer la ventaja que supone la modernización de sistemas de distribución, el cambio del nivel de tensión que origina una mayor capacidad de carga para las instalaciones y mayor producción, asimismo es menester mencionar que esto conlleva a un cambio tecnológico con equipamiento y sistemas de protección de mejor performance, también los sistemas modernos de instrumentación y medición que colaboran con los nuevos requerimientos o requisitos solicitados para incremento de potencia o reducción de fallas. Los métodos de validación que se toman en cuenta son los desarrollados en base a las normas técnicas, buenas prácticas y experiencia del Concesionario, las empresas ejecutoras y los profesionales del Colegio de Ingenieros del Perú; los resultados que se han obtenido han sido tan satisfactorios que se han mitigado o desaparecido los problemas de cortes de energía intempestivos, reducción del riesgo eléctrico con cero accidentes a la fecha, crecimiento sostenible de la demanda, confiabilidad del sistema, cumplimiento de la normativa Indeci, Osinergmin y Ministerio de Energía y Minas, normas internacionales relacionadas, continuidad ininterrumpida del servicio, satisfacción del cliente interno y externo. | es |
dc.description.abstract | In this Professional Sufficiency Report, the technical aspects for the modernization of the Medium Voltage distribution facilities and substations for an Institute of Higher Technical Education will be disclosed. The guidelines of the Modernization Project are indicated, from the electric feeder and distribution networks, the protection and coordination system, the energy equipment, the safety and reliability of the system. The present problem of the 10 kV voltage level in facilities from the 60s-70s, the policies of the Electricity Concessionaire, as well as issues related to safety and reliability, which have legal significance, are raised. This Project not only describes the solution to this problem, but also makes known the advantage of the modernization of distribution systems, the change in the voltage level that causes a greater load capacity for the facilities and greater production, it is also necessary It should be mentioned that this leads to a technological change with better performance equipment and protection systems, as well as modern instrumentation and measurement systems that collaborate with the new requirements or requested requirements for increasing power or reducing faults. The validation methods that are taken into account are those developed based on the technical standards, good practices and experience of the Electricity Concessionaire, the executing companies and the professionals of the College of Engineers of Peru; The results obtained have been so satisfactory that the problems of untimely power cuts have been mitigated or disappeared, reduction of electrical risk with zero accidents to date, sustainable growth in demand, system reliability, compliance with Indeci regulations, Osinergmin and Ministry of Energy and Mines, related international standards, uninterrupted continuity of service, internal and external customer satisfaction. | en |
dc.description.uri | Trabajo de suficiencia profesional | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/restrictedAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Distribución de media tensión | es |
dc.subject | Educación Técnica Superior | es |
dc.subject | Distribución de energía eléctrica | es |
dc.title | Modernización del sistema de utilización de media tensión de un instituto de educación técnica superior | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero Electricista | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Eléctrica y Electrónica | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería Eléctrica | es |
thesis.degree.program | Ingeniería | es |
renati.advisor.orcid | https://orcid.org/0000-0002-3335-0926 | es |
renati.author.dni | 08162561 | - |
renati.advisor.dni | 25600262 | - |
renati.type | http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional | es |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es |
renati.discipline | 711046 | - |
renati.juror | Cáceres Cárdenas, Félix Víctor | - |
renati.juror | Velazco Lorenzo, Dinau | - |
dc.publisher.country | PE | es |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.02.01 | es |
Aparece en las colecciones: | Ingeniería Electrica |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
soto_pa.pdf | 6,39 MB | Adobe PDF | Visualizar/Abrir | |
informe_de_similitud.pdf | 166,09 kB | Adobe PDF | Visualizar/Abrir | |
soto_pa(acta).pdf | 164,88 kB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por: