Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/27021
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorZambrana Flores, Henry Mamfredo-
dc.contributor.authorLugo Lopez, Yerson Fuber-
dc.creatorLugo Lopez, Yerson Fuber-
dc.date.accessioned2024-04-17T20:55:39Z-
dc.date.available2024-04-17T20:55:39Z-
dc.date.issued2023-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/27021-
dc.description.abstractEn el presente trabajo de investigación, se planteó una selección de ubicación de desmonte en una mina de cobre a tajo abierto con el objetivo de reducir el costo de acarreo. En base a los datos recolectados, se procedió a elaborar las distintas alternativas de ubicación de depósitos de desmonte teniendo en cuenta los límites de propiedad definidos por los permisos por la autoridad competente En las alternativas desarrolladas, se consideraron dos botaderos: uno al norte del tajo, de1,628 millones de toneladas, y otro al oeste, de 2,511 millones de toneladas. Estas alternativas fueron desarrolladas definiendo los tonelajes de material estéril disponible y las posibles ubicaciones para las descargas, además, se diseñaron en función de los límites de la propiedad, presentando tres alternativas de ubicación de depósitos de desmonte. Todas las alternativas cumplieron con el material estéril del plan de minado con una holgura de 5%, 62% y 67% respectivamente. Posteriormente, se procedió a realizar un plan de minado utilizando el software minero MPSO (Mine Plan Schedule Optimizer). En base al plan de minado previo, el cual desarrolla lo siguiente; el total movido, requerimiento de planta, descargas en los depósitos de desmonte en base a las alternativas contempladas. A continuación, se calcularon las horas de transporte y la flota de camiones mineros para cada alternativa. Como resultado, la alternativa 3 representó un ahorro de 6% en horas totales respecto a la alternativa 2 y un ahorro de 14% en horas totales con la alternativa 1. Con respecto a los camiones es una disminución de 4 y 17 camiones respectivamente. Luego, se realizó una evaluación económica, estudiando cualitativamente aspectos geotécnicos, operativos y de planificación, junto con la cuantificación de los costos operacionales y de inversión de acarreo mina. En base a la evaluación económica, se descartó la alternativa 1, debido a que no presentó mucha holgura en capacidad de desmonte. Las dos alternativas con que se sigue trabajando, la alternativa 3 presenta ahorros en OPEX de transporte mina de 114 millones de dólares y 18 millones de dólares en CAPEX respecto a la alternativa 2. Realizando un análisis de los resultados, se recomienda la alternativa 3, la cual respeta los límites de propiedad y utiliza el espacio autorizado.es
dc.description.abstractIn this work, the selection of the location of waste rock dumps in an open pit copper mine with the objective of reducing hauling costs was proposed. Based on the data collected, we proceeded to develop the different alternatives for the location of waste rock dumps, considering the property boundaries defined by the permit’s competent authority. In the alternatives developed, two dumps were considered: one to the north of the pit, of 1,628 million tons, and another to the west, of 2,511 million tons. These alternatives were developed by defining the tonnages of waste material available and the possible locations for the dumps, in addition, they were designed based on the property boundaries, presenting three alternatives for the location of waste rock dumps. All alternatives met the mine plan waste material with a clearance of 5%, 62% and 67%, respectively. Subsequently, a mine plan was made using the mining software MPSO (Mine Plan Schedule Optimizer). Based on the previous mining plan, which develops the following: the total moved, plant throughput, unloading in the waste dumps based on the alternatives contemplated. Then, the hours of transportation and the fleet of mining trucks were calculated for each alternative. As a result, alternative 3 represented a saving of 6% in total hours compared to alternative 2 and a saving of 14% in total hours compared to alternative 1. With respect to trucks, there is a decrease of 4 and 17 trucks, respectively. Then, an economic evaluation was carried out, studying qualitatively geotechnical, operational and planning aspects, together with the quantification of operational and investment costs of mining haulage. Based on the economic evaluation, alternative 1 was discarded because it did not present much clearance capacity. The two alternatives with which work continues, alternative 3 presents savings in mine haulage OPEX of US$114 million and US$18 million in CAPEX. Analyzing the results, we recommend alternative 3, which respects the property boundaries and uses the authorized space.en
dc.description.uriTrabajo de suficiencia profesionales
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectAcarreo mineroes
dc.subjectMina a tajo abiertoes
dc.subjectDepósito de desmonte de minerales
dc.subjectCobrees
dc.titleSelección de ubicación de un depósito de desmonte para reducir el costo de acarreo en una mina de cobre a tajo abiertoes
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero de Minases
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgicaes
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería de Minases
thesis.degree.programIngenieríaes
renati.advisor.orcidhttps://orcid.org/0000-0001-9019-191Xes
renati.author.dni47157259-
renati.advisor.dni08609249-
renati.typehttp://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesionales
renati.levelhttp://purl.org/pe-repo/renati/nivel#tituloProfesionales
renati.discipline724026-
renati.jurorCorimanya Mauricio, José Antonio-
renati.jurorMendoza Apolaya, Atilio-
dc.publisher.countryPEes
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.07.05es
Aparece en las colecciones: Ingeniería de Minas

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
lugo_ly.pdf6,57 MBAdobe PDFVisualizar/Abrir
lugo_ly(acta).pdf314,83 kBAdobe PDFVisualizar/Abrir
informe_de_similitud.pdf1,84 MBAdobe PDFVisualizar/Abrir
carta_de_autorización.pdf514,44 kBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI