Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/27097
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorBardales Cruz, Jorge Luis-
dc.contributor.authorCarmona Casimiro, Jhony Deyvi-
dc.creatorCarmona Casimiro, Jhony Deyvi-
dc.date.accessioned2024-05-08T20:12:18Z-
dc.date.available2024-05-08T20:12:18Z-
dc.date.issued2023-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/27097-
dc.description.abstractEl presente trabajo de investigación abordará el tema referente al proceso de cementación primaria, en pozo problemas de pérdida de circulación durante la perforación y cementación, particularmente en formaciones de baja gradiente de fractura y ventana operativa con presiones de poros anormales, es decir la presión poral y de fractura están muy cercas. El objetivo de una cementación eficiente y segura nos permitirá colocar una lechada de cemento en el espacio anular entre las paredes del pozo y el revestidor con la finalidad de prevenir el movimiento de fluidos entre zonas. Una ineficiente cementación primaria es sin duda una de las preocupaciones más importantes en una cementación de un pozo petrolero para mantener un sello hidráulico entre formación y revestidor. Sin embargo, la cuenca Talara, al ser una cuenca de mayor desarrollo en el noroeste peruano; es sin duda una cuenca depletada donde existen formación muy complejas y falladas con una ventana operativa con presiones de poros anormales Este trabajo presentará la viabilidad técnica y económica de la implementación del dispositivo Multi-Stage Cementing Tool en pozos del Lote III, el cual nos permitirá mantener la integridad del pozo con problemas de perdida de circulación en formaciones con bajas gradientes de fractura y con presiones de poro anormal. Este dispositivo fue diseñado para cementaciones en dos a más etapas una operación de cementación sin problemas. La implementación del dispositivo Multi-Stage Cementing Tool es un proceso complejo que requiere una planificación y ejecución cuidadosas. Sin embargo, puede ser una forma muy efectiva de asegurar que un pozo esté correctamente cementado en pozos con pérdida de circulación en el Lote III. Los resultados obtenidos en los registros eléctricos CBL/VDL muestra un buen aislamiento hidráulico en las formaciones objetivos, cumpliendo con el objetivo y con la finalidad para las completaciones en adelante, es decir punzonamiento y fracturamiento hidráulico en el Lote III. Este resultado demuestra un alto grado de confiabilidad, por recomendable la masificación de este dispositivo en un número mayor problemas de perdida de circulación durante la perforación y pozos con similares.es
dc.description.abstractThis research work will address the issue of reference to the primary cementing process, in wells with lost circulation problems during drilling and cementing, particularly in formations with a low fracture gradient and narrow operating window, that is, pore and fracture pressure. they are very close. The goal of efficient and safe cementing will allow us to place a cement slurry in the annular space between the well walls and the revestidor in order to prevent fluid movement between zones. Inefficient primary cementing is undoubtedly one of the most important concerns during the drilling and completion of an oil well to maintain a hydraulic seal between formation and revestidor. However, the Talara basin, being a more developed basin in northwestern Peru; It is undoubtedly a depleted basin where there are very complex and faulted formations with a very narrow operating window. This work will show the technical and economic feasibility of implementing the Multi- Stage Cementing Tool device in Block III wells, which will allow us to maintain the integrity of the well with lost circulation problems in formations with low fracture gradients and with operating windows. very narrow. This device was designed for cementing in two or more stages for a trouble-free cementing operation. Implementation of the Multi-Stage Cementing Tool device is a complex process that requires careful planning and execution. However, it can be a very effective way to ensure that a well is properly cemented in wells with lost circulation in Block III. The results obtained in the CBL/VDL electrical logs show good hydraulic isolation in the target formations, detecting with the objective and with the purpose for the completions onwards, that is, punching and hydraulic fracturing in Block III. This result demonstrates a high degree of reliability, which is why it would be advisable to massify these devices in a greater number of wells with lost circulation problems during drilling and wells with similar characteristics.en
dc.description.uriTesises
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectPozos petroleroses
dc.subjectProceso de cementaciónes
dc.subjectDispositivo Multi-Stage Cementing Tooles
dc.titleImplementación de Multi-Stage Cementing Tool para mantener la integridad del pozo durante trabajos de cementación primaria en pozos con pérdida de circulación en el Lote IIIes
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero de Petróleo y Gas Naturales
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería de Petróleo, Gas Natural y Petroquímicaes
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería de Petróleo y Gas Naturales
thesis.degree.programIngenieríaes
renati.advisor.orcidhttps://orcid.org/0000-0002-9621-2715es
renati.author.dni73763607-
renati.advisor.dni08661925-
renati.typehttp://purl.org/pe-repo/renati/type#tesises
renati.levelhttp://purl.org/pe-repo/renati/nivel#tituloProfesionales
renati.discipline724056-
renati.jurorCortegana Rucoba, Oscar Noé-
renati.jurorRamos Rojas, José Gabriel-
dc.publisher.countryPEes
dc.subject.ocdehttp://purl.org/pe-repo/ocde/ford#2.07.03es
Aparece en las colecciones: Ingeniería de Petróleo

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
carmona_cj.pdf6,05 MBAdobe PDFVisualizar/Abrir
carmona_cj(acta).pdf242,02 kBAdobe PDFVisualizar/Abrir
carta_de_autorización.pdf365,42 kBAdobe PDFVisualizar/Abrir
informe_de_similitud.pdf851,17 kBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI