Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/4581
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorTeves Rojas, Augusto-
dc.contributor.authorLlamocca Hinostroza, Rivert-
dc.creatorLlamocca Hinostroza, Rivert-
dc.date.accessioned2017-09-06T22:14:41Z-
dc.date.available2017-09-06T22:14:41Z-
dc.date.issued2016-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/4581-
dc.description.abstractMinera La Zanja S.R.L realiza sus operaciones mineras en el Proyecto La Zanja, el cual comprende dos yacimientos de oro con contenidos de plata denominados San Pedro Sur (400K OzAu) y Pampa Verde (309K OzAu), los cuales por su proximidad a la superficie y el volumen de mineral diseminado, son trabajados mediante el método de operación de tajo abierto. La producción promedio anual a partir del año 2011 es de 100,000 OzAu y 450,000 OzAg. De lo mencionado anteriormente la unidad minera la zanja cuanta con dos tajos, tajo Pampa Verde y tajo San Pedro Sur, cada tajo tiene diferentes características geo mecánicas, presencia de agua, fisuras, macizo rocoso competente, macizo rocoso fracturado, contacto con argilico avanzado, etc. Para lo cual analizaremos dos propuestas de columna de perforación; la primera propuesta columna de perforación de 5” de diámetro y la segunda propuesta columna de perforación de 5 ½” de diámetro. La segunda propuesta se trabajó hasta fines del 2012 ya que los resultados técnico-económicos fueron favorables para la columna de perforación de 5” de diámetro, obteniéndose un menor TDC (US$/m) con respecto a la segunda propuesta. Como se sabe ya se eligió la columna adecuada de perforación para reducir el TDC (US$/m). Ahora lo que se busca es zonificar el macizo rocoso, seleccionar el diseño de malla para mineral y desmonte con lo cual buscaremos reducir los metros perforados por proyecto, maximizar la vida útil de los aceros y reducir el TDC. La zonificación del macizo rocoso se realizó mediante el control de velocidades de diferentes proyectos en el tajo SPS y PV. Como conclusión a todo lo anterior, se puede decir que con la nueva columna de perforación 5” de diámetro, zonificación del macizo rocoso y el cuidado de los aceros de perforación (afilado de brocas y revestimiento de los gets), se obtuvieron resultados post Perforación y voladura favorables o similares al caso anterior, reduciendo el TDC (US$/m) en 4.0% y los costos en aceros de perforación en 12.0% menor. Las operaciones mineras unitarias de Perforación y Voladura tienen una influencia predominante en el ciclo total de minado, porque los resultados de estas dependerá la producción y productividad y por ende los costos en US$/t de las subsiguientes operaciones mineras unitarias.es
dc.description.abstractThe mining Company called “La Zanja” S.R.L performs its mining operations in the Project “La Zanja”, which comprises of two deposits of gold with silver content called San Pedro Sur (400K Oz. Au) and Pampa Verde (309K OzAu), which due to its proximity to the Surface and volumen of disseminatedore are worked using the method of open-pit operation. The average anual production from the year 2011 is 1000,000 OzAu and 450,000 OzAg. As started above the mining unit “La Zanja” has two open pits, pit Pampa Verde and pit San Pedro Sur, each pit has different features geo mechanical , presence of water, cracks, competent rock mass, fractured rock mass, advanced argillic contact, etc. To discuss two proposals of drill column: the first proposal is a column of drilling 5 "in diameter and the second proposal is a column of drilling of 5 ½" in diameter. The second proposal is worked until the end of 2012 as the technical and economic results were favorable for the drill column 5 "in diameter, resulting in a lower TDC (US$/m) with respect to the second proposal. As already known the appropriate drill column was selected to reduce the TDC (US$/m). Now what is sought is zoning the rock mass, select the mesh design for ore and waste which seek to reduce the meters drilled per project, maximize battery life and reduce TDC steels.The zoning of the rock mass was conducted by controlling speeds of different projects in the pit SPS and PV. As a conclusion to all of the above, we can say that with the new drill string 5 "in diameter, solid rock zoning care and drill steel (drill sharpening and coating of gets), results were obtained post-blast favorable and similar to the previous case, reducing the TDC (US$/m) in 4.0% and costs of drilling in steel 12.0% lower. Mining unit Drilling and Blasting operations have a predominant influence on the total mining cycle, because the results of these depend on the production and productivity and therefore costs US $ / t of subsequent mining operations unit.en
dc.description.uriTesises
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectReduccion de costoses
dc.subjectPerforación y voladura en mineríaes
dc.subjectMétodos de perforaciónes
dc.subjectAceros de perforaciónes
dc.titleReducción del costo de perforación DTH por selección de la columna de perforación y cuidado de aceroses
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero de Minases
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgicaes
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería de Minases
thesis.degree.programIngenieríaes
Aparece en las colecciones: Ingeniería de Minas

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
llamocca_hr.pdf5,38 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI