Título : Ampliación proyecto mina 5 lado norte Shougang Hierro Perú
Autor : Bocanegra Morales, Huber José
Asesor : Corimanya Mauricio, José Antonio
Palabras clave : Proyectos mineros;Operaciones mineras;Costos de operación
Fecha de publicación : 2014
Editorial : Universidad Nacional de Ingeniería
Resumen : El informe detalla las operaciones desarrolladas en la ampliación de la mina 5 lado norte de Shougang Hierro Perú S.A.A el cual fue desarrollado gracias a la información proporcionada por la empresa contratista e información por parte del cliente Shougang Hierro Perú S.A.A. En el informe podemos encontrar la ubicación del cuerpo mineralizado, la geología local y regional, detalles del planeamiento para el desarrollo de las operaciones por parte de San Martin Contratistas Generales, encontrando dificultades dentro de las operaciones que incrementan nuestros costos operativos, optando por un cambio de diseño de la mina para avanzar con nuestras operaciones debido a un cuerpo mineralizado en la rampa de diseño por donde tenemos que profundizar, analizamos los costos de perforación, costos de carguío, costo de acarreo. San Martin Contratistas Generales está encargado de la perforación, para ello analizamos nuestros costos de perforación, la voladura es realizado por el cliente y los costos son asumidos directamente por el cliente, San Martin Contratistas Generales S.A. verifica el correcto carguío de los taladros, y factor de carga correspondiente, para no tener dificultades en el carguío y acarreo del material volado. Analizamos si el proyecto fue favorable o no a la contratista, por el nuevo diseño que se da en plena operación.
This report describes the operations performed in the north expansion project (mine 5) of Shougang Hierro Peru S.A.A., which was possible due to the information provided by the contractor –San Martin Contratistas Generales– and the client –Shougang Hierro Peru S.A.A. Furthermore, the report includes the ore body location as well as the local and regional geology; it also details the mining plan of operations conducted by San Martin Contratistas Generales. However, some hindrances in the operational activities were found that increased the operating costs; thus, a change in the mine design was implemented to move on with the operations due to an ore body on the ramp design, where the mining operations shall go deeper. The drilling, loading and hauling costs are also analyzed. San Martin Contratistas Generales is responsible for the drilling process; therefore, its costs are assessed, the blasting operations are performed by the client, who also incurs the expenses. San Martin Contratistas Generales checks the proper loading of holes and pertinent powder factor to avoid problems during the loading and hauling of the blasted material. This report analyzes whether the project was favorable or not for the contractor due to the new design implemented in full operation.
URI : http://hdl.handle.net/20.500.14076/9263
Derechos: info:eu-repo/semantics/restrictedAccess
Aparece en las colecciones: Ingeniería de Minas

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
bocanegra_mh.pdf6,27 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI