Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/9676
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorPalomino Flores, Tito Luis-
dc.contributor.authorHerrera Crispin, Freddy Alvaro-
dc.creatorHerrera Crispin, Freddy Alvaro-
dc.date.accessioned2018-03-26T14:45:22Z-
dc.date.available2018-03-26T14:45:22Z-
dc.date.issued2015-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/9676-
dc.description.abstractLa CIA Minera Cerro Lindo del grupo Votorantim-Milpo ampliara su producción desde 15 000 tpd a 18 000 tpd por lo que requiere realizar un estudio de ventilación que pueda dar soporte a este nivel de producción. Para esto se realizará el presente estudio en tres etapas. La primera en la cual se mostrara la situación actual de la mina, se tiene una cobertura actual de 92% con un ingreso de aire de 1`305,390 CFM, de los cuales el requerimiento por todo el personal es 35,880 CFM, por equipos es 1`390,422, también se mostrara el modelamiento de la red actual de la mina con el uso de software VENTSIM VISUAL PREMIUM, nuestro modelo la interior mina muestra un ingreso de aire de 1`305,390CFM y nuestro modelo en el software brinda 1`370,279 CFM con lo cual nuestra aproximación con la realidad es de 95.2% y nuestro modelo queda validado. En un segunda etapa se realizará el modelamiento con el uso de software VENTSIM VISUAL PREMIUM para la selección de ventiladores de acuerdo a las dimensiones de nuestros equipos diésel para lo cual se realizaron corridas en el modelo con ventiladores de 250 000 CFM y 200 000 CFM de diversas presiones pero los ventiladores más adecuados de acuerdo a nuestra infraestructura de ventilación y que optimizan nuestro sistema de ventilación son ventiladores de 200 000 CFM y 9.5” de presión total de agua, estos ventiladores deben ser capaces de permitir el ingreso de 2`046,141 CFM que son requeridos para la ampliación de producción a 18 000 tpd. En la tercera etapa se realizará la evaluación económica del proyecto, inversiones en excavaciones horizontales y verticales, equipos de ventilación y costo de energía de ventilación dentro de estos costos el costo de energía por ventilación representa el 75% del costo total del área. Para dar soporte a las 18 000 tpd es necesario tener dos RB de 3mts de diámetro con una preparación vertical de 1820 mts, una preparación horizontal 1120mts, construir 3 bocaminas adicionales de ingreso de aire fresco y una adquisición de 4 ventiladores de 200 000 CFM y 9.5” de presión total de agua. El análisis en las tres etapas se centrará en el sistema primario de ventilación, dado que los sistemas de ventilación secundarios por cada cuerpo mineralizado son consecuencia del sistema primario de ventilación, la preparación en interior requerida y los equipos de ventilación son menores.es
dc.description.abstractThe CIA Minera Cerro Lindo Votorantim-Milpo the group expanded its production from 15,000 tpd to 18,000 tpd therefore requires a study of ventilation that can support this level of production. For this, the present study was done in three stages. The first in which the current status of the mine show, you have a current coverage of 92% with an income 1`305,390 CFM air, of which the requirement for all staff is 35.880 CFM team is 1 `390.422, the modeling of the existing network of the mine using software VISUAL PREMIUM Ventsim be shown too, our model shows the inner mine air 1`305,390CFM income and our model in the software provides 1`370,279 CFM thus our approach to reality is 95.2% and our model is validated. In a second stage modeling was performed using VISUAL PREMIUM Ventsim software for fan selection according to the dimensions of our equipment diesel which runs were carried out in the model with 250,000 fans CFM and 200,000 CFM various pressures but the most suitable fan according to our infrastructure that optimize our ventilation and ventilation system are fans of 200,000 CFM and 9.5 "total pressure of water, these fans should be able to allow in 2`046,141 CFM which are required for the expansion of production to 18,000 tpd. In the third stage the economic evaluation of the project, investments in horizontal and vertical excavations, ventilation and energy cost of ventilation in these costs energy costs for ventilation represents 75% of the total cost of the area will be. To support the 18,000 tpd is necessary to have two RB 3m in diameter with a vertical preparation of 1820 meters, a horizontal preparation 1120mts, build 3 additional adits entrance of fresh air and an acquisition 4 200 000 CFM fans and 9.5 "total water pressure. The analysis in three stages to focus on the primary ventilation system, since secondary ventilation systems for each ore body are the result of the primary ventilation system inside the preparation required and ventilation equipment are lower.en
dc.description.uriTesises
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/restrictedAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectVentilación de minases
dc.subjectOperaciones minerases
dc.titleModelización y simulación del sistema de ventilación de la mina Cerro Lindo - Cia Minera Milpo S.A.es
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero de Minases
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgicaes
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería de Minases
thesis.degree.programIngenieríaes
Aparece en las colecciones: Ingeniería de Minas

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
herrera_ca.pdf5,07 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI