Por favor, use este identificador para citar o enlazar este ítem: http://hdl.handle.net/20.500.14076/29166
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorTacza Zevallos, John Nelinho-
dc.contributor.authorCondori Nina, Gonzalo-
dc.creatorCondori Nina, Gonzalo-
dc.date.accessioned2026-04-16T19:18:20Z-
dc.date.available2026-04-16T19:18:20Z-
dc.date.issued2025-
dc.identifier.urihttp://hdl.handle.net/20.500.14076/29166-
dc.description.abstractEn el Perú, la creciente brecha en infraestructura deportiva ha generado demandas ciudadanas, especialmente en el departamento de Arequipa, donde muchas comunidades carecen de instalaciones adecuadas para la práctica del deporte y la recreación. Aunque los gobiernos han impulsado programas de construcción para atender esta necesidad, numerosos proyectos presentan deficiencias como errores de diseño, sobrecostos y demoras, debido a una planificación deficiente y expedientes técnicos mal elaborados. Ante esta problemática, la presente tesis propone la aplicación de la metodología BIM (Building lnformation Modeling) para optimizar el tiempo y los costos en la planificación de infraestructuras deportivas de mediana complejidad en Arequipa. La investigación se basó en la elaboración de modelos 3D a partir de expedientes técnicos convencionales, con archivos en CAD, Excel, Word y PDF, aplicados en dos proyectos: uno en la provincia de Castilla y otro en La Unión. Los resultados demostraron mejoras en la precisión de metrados, alineación con la realidad del entorno y procedimientos constructivos más eficientes. La planificación basada en BIM permitió comparar el modelo inicial con simulaciones 4D, revelando beneficios concretos. En el proyecto 01, se redujo el tiempo en un 41,86 % y el costo total en un 4,11 %; en el proyecto 02, el tiempo se redujo en un 33,33 % y el costo en un 12,31 %. La tesis concluye que el uso de BIM mejora significativamente la calidad de la planificación y ejecución de proyectos, permitiendo identificar y corregir inconsistencias, por lo que se recomienda su implementación en todos los proyectos de infraestructura deportiva.es
dc.description.abstractIn Peru, the growing gap in sports infrastructure has generated citizen demands, especially in the department of Arequipa, where many communities lack adequate facilities for sports and recreation. Although governments have promoted construction programs to address this need, numerous projects suffer from deficiencies such as design errors, cost overruns, and delays due to poor planning and poorly prepared technical files. Given this problem, this thesis proposes the application of the BIM (Building lnformation Modeling) methodology to optimize time and costs in the planning of medium complexity sports infrastructure in Arequipa. The research was based on the development of 30 models from conventional technical files, with files in CAD, Excel, Word, and PDF, applied to two projects: one in the province of Castilla and another in La Unión. The results demonstrated improvements in measurement accuracy, alignment with the surrounding reality, and more efficient construction procedures. BIM-based planning allowed the initial model to be compared with 40 simulations, revealing concrete benefits. In Project 1, time was reduced by 41,86 % and total cost by 4,11 %; in Project 2, time was reduced by 33,33 % and cost by 12,31 %. The thesis concludes that the use of BIM significantly improves the quality of project planning and execution, allowing for the identification and correction of inconsistencies. Therefore, its implementation is recommended for all sports infrastructure projects.en
dc.description.uriTesises
dc.formatapplication/pdfes
dc.language.isospaes
dc.publisherUniversidad Nacional de Ingenieríaes
dc.rightsinfo:eu-repo/semantics/openAccesses
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/es
dc.sourceUniversidad Nacional de Ingenieríaes
dc.sourceRepositorio Institucional - UNIes
dc.subjectInfraestructura civiles
dc.subjectBuilding Information Modeling (BIM)es
dc.subjectCostos de construcciónes
dc.subjectOptimización de los procesoses
dc.subjectArequipa (Perú : Departamento)es
dc.titleImplementación BIM para optimizar el tiempo y costo en la planificación de infraestructuras deportivas de mediana complejidad en Arequipa, 2024es
dc.typeinfo:eu-repo/semantics/bachelorThesises
thesis.degree.nameIngeniero Civiles
thesis.degree.grantorUniversidad Nacional de Ingeniería. Facultad de Ingeniería Civiles
thesis.degree.levelTítulo Profesionales
thesis.degree.disciplineIngeniería Civiles
thesis.degree.programIngenieríaes
renati.advisor.orcidhttps://orcid.org/0000-0002-1763-9375es
renati.author.dni70865606-
renati.advisor.dni10054349-
renati.typehttps://purl.org/pe-repo/renati/type#tesises
renati.levelhttps://purl.org/pe-repo/renati/level#tituloProfesionales
renati.discipline732016-
renati.jurorColonio García, Luis Alfredo-
renati.jurorRegalado Espinoza, Marck Steewar-
dc.publisher.countryPEes
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.01es
Aparece en las colecciones: Ingeniería Civil

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
condori_ng.pdf13,77 MBAdobe PDFVisualizar/Abrir
condori_ng(acta).pdf386,71 kBAdobe PDFVisualizar/Abrir
informe_de_similitud.pdf594,59 kBAdobe PDFVisualizar/Abrir
carta_de_autorización.pdf280,46 kBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI