Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.14076/14719
Title: Supervisión de la construcción de un laboratorio de control de calidad de una empresa minera
Authors: Roncal Castro, Juan Carlos
Advisors: Ríos Segura, Juan Guillermo
Keywords: Control de calidad;Laboratorio;Construcción
Issue Date: 2018
Publisher: Universidad Nacional de Ingeniería
Abstract: El presente informe de suficiencia profesional está basado en el trabajo que desarrolló la supervisión interna en la ejecución de la obra que lleva por nombre "Sala de Muestras Perubar II”, esta obra se desarrolló en la Provincia Constitucional del Callao, dentro de un ambiente contaminado con polvo de mineral, debido a que el cliente desarrolla operaciones logísticas de almacenamiento, mezclado, acondicionamiento y embarque de concentrados de minerales a empresas del sector minero, vinculadas y de terceros; siendo estos minerales comercializados el zinc, cobre y plomo. El trabajo que desarrollaron los supervisores internos se basa en planes de trabajo tanto para calidad, seguridad, producción y administrativos, apuntando con un solo objetivo el cual es garantizar la correcta ejecución de la obra con la calidad exigida en las especificaciones técnicas, garantizar la seguridad de los trabajadores y culminar en el tiempo y costo previsto. Para ello se consideró el medio real donde se desarrollaría el proyecto, el cual estaba contaminado y esta contaminación podría afectar las propiedades físicas, químicas y mecánicas de los materiales de construcción incidentes; al analizar este medio real, se decide dar un tratamiento especial a los materiales de construcción incidentes para que no se viesen afectados por esta contaminación de polvo de mineral. Se explica también en el presente trabajo de suficiencia la filosofía Lean Construction y las herramientas de gestión basadas en esta filosofía empleadas en el desarrollo de la obra, tales herramientas como look ahead, programación semanal, programación diaria, análisis de restricciones, porcentaje de plan cumplido, entre otras.
The present report of professional adequacy is based on the work developed by the oversight in the execution of the work that bears the name "Showroom Perubar II", this work was developed in the Constitutional Province of Callao, within an environment contaminated with mineral dust, because the client develops logistics operations of storage, mixing, packaging and shipment of mineral concentrates to companies in the mining sector, and linked third parties; being marketed these minerals zinc, copper and lead. The work developed by the internal supervisors, is based on work plans both for quality, safety, production and administrative, pointing with a single objective which is to ensure the proper execution of the work with the quality required in the technical specifications, ensure the safety of workers and culminate in the time and cost. For this was considered the real medium where you would develop the project, which was contaminated and this contamination could affect the physical, chemical and mechanical properties of the materials of construction incidents; to analyze this means real, it was decided to give special treatment to the materials of construction for incidents that are not affected by this contamination of mineral dust. It also explains the present sufficiency philosophy Lean Construction and management tools based on this philosophy used in the development of the work, such tools how to look ahead, weekly schedule, daily schedule, analysis of restrictions, percentage of plan fulfilled, among others.
URI: http://hdl.handle.net/20.500.14076/14719
Rights: info:eu-repo/semantics/openAccess
Appears in Collections:Ingeniería Civil

Files in This Item:
File Description SizeFormat 
roncal_cj.pdf16,16 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI