Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.14076/20766
Title: Evaluación económica del sistema de minado en el método tajeo por subniveles
Authors: Poma Urbano, Jorge Luis
Advisors: Chávez Valdivia, Adolfo Jesús
Keywords: Minería;Tajeo por subniveles;Análisis geomecánico
Issue Date: 2019
Publisher: Universidad Nacional de Ingeniería
Abstract: En el presente trabajo de investigación se analiza económicamente el aumento de la longitud de minado de 8 a 14 metros en tajos explotados mediante el método de Tajeo por Subniveles con potencias mayores a 10 metros en la Unidad Minera Inmaculada. Para lo cual se realizó una comparación entre el minado de 14 metros de longitud versus el minado de 8 y 6 metros de longitud. Primero, se definió ciclos de minado tomando en cuenta los indicadores de la unida minera y la evaluación geomecánica. Luego se analizaron los costos de minado en cada caso para poder realizar la comparación. Se debe mencionar que en estas comparaciones se obtuvieron buenos resultados desde el punto de económico. Se llevaron a cabo el minado de 6 tajos de longitudes de 14 metros, los cuales siguieron las recomendaciones geomecánicas. No se tuvieron problemas de estabilidad que comprometieran la seguridad. Dando buenos resultados de costos y dilución. Luego de las pruebas se recomienda la estandarización del minado a las dimensiones mencionadas anteriormente. También dentro del estándar se debe considerar dos accesos para la limpieza de estos tajos de gran dimensión en la Unidad Minera Inmaculada para hacerlo mucho más productivos.
In this research work is analyzed economically the increase in the length of mining from 8 to 14 meters in stopes operated by the Sublevel Stoping mining method with width larger than 10 meters in the “Inmaculada Mining Unit”. For which, a comparison was made between the mining of 14 meters in length versus the mining of 8 and 6 meters in length. First, mining cycles were defined taking into account the ratios of the mining unit and the geomechanical evaluation. Then the mining costs were analyzed in each case to make the comparison. It should be mentioned that in these comparisons good results were obtained from the economic point of view. The mining of 6 stopes of lengths of 14 meters was carried out, which followed the geomechanical recommendations. There were no stability problems that compromised safety. Giving good results of costs and dilution. After the tests, the standardization of the mining to the dimensions mentioned above is recommended. Also within the standard should be considered two accesses for the cleaning of these large-sized stopes in the “Immaculada Mining Unit” to make it much more productive.
URI: http://hdl.handle.net/20.500.14076/20766
Rights: info:eu-repo/semantics/restrictedAccess
Appears in Collections:Ingeniería de Minas

Files in This Item:
File Description SizeFormat 
poma_uj.pdf6,26 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI