Title: Cálculo de flota óptima y elección de la menor ruta para el aumento de la producción de mineral y desmonte minimizando los costos de transporte en el Glory Hole - Atacocha
Authors: León Cordova, Elmer
Advisors: Rosales Huamani, Jimmy Aurelio
Keywords: Produccion de minerales;Flota;Costos de transporte
Issue Date: 2020
Publisher: Universidad Nacional de Ingeniería
Abstract: Durante el desarrollo de esta tesis se discutirá, analizara y elegirá la mejor flota optima que minimice los costos de transporte de material en la mina Atacocha, El objetivo principal es realizar un análisis económico y operacional de cantidad de número de equipos de acarreo y cuál es la ruta con menor costo operativo. Para lo cual evaluaremos la ruta actual y un nuevo proyecto de construcción de rampa que minimiza la distancia y por lo tanto el ciclo de acarreo disminuya, en toda operación minera un menor ciclo de acarreo conlleva a costos más bajos en USD/Ton. En el Glory Hole Atacocha actualmente tiene un problema de falta de áreas para la descarga de material de desbroce, por ello, se tuvo el plan de realizar la descarga en el recrecimiento de la presa de relaves teniendo en esta zona un gran volumen para la descarga de material estéril y poder aumentar la producción en el Glory Hole Atacocha. Los cálculos en la presente tesis nos llevaran a evaluar la viabilidad de realizar una nueva ruta de acarreo y como esta disminuirá los costos en trasporte, otra manera de evaluar la viabilidad será mediante el cálculo del VAN y TIR como evaluación económica (margen final) se elegirá aquella que tenga mayor retorno para la empresa y por lo tanto la que nos dé una mayor utilidad al finalizar un periodo.
During the development of this thesis will discuss, analyze and choose the best optimal fleet that minimizes the costs of transporting material in the Atacocha mine, The main objective is to perform an economic and operational analysis of quantity of number of hauling equipment and which is the route with the lowest operating cost. For which we will evaluate the current route and a new ramp construction project that minimizes the distance and therefore the haul cycle decreases, in any mining operation a lower haul cycle leads to lower costs in USD / Ton. In the Glory Hole Atacocha currently has a problem of lack of areas for the discharge of clearing material, therefore, the plan was made to perform the discharge in the regrowth of the tailings dam having in this area a large volume for unloading of sterile material and to increase production in the Glory Hole Atacocha. The calculations in this thesis will lead us to evaluate the feasibility of carrying out a new haul route and how it will reduce transport costs, another way to evaluate the viability will be by calculating the NPV and IRR as economic evaluation (final margin). will choose the one with the highest return for the company and therefore the one that gives us the greatest utility at the end of a period.
URI: https://repositorio.uni.edu.pe/handle/20.500.14076/21720
Rights: info:eu-repo/semantics/restrictedAccess
Appears in Collections:Ingeniería de Minas

Files in This Item:
File Description SizeFormat 
leon_ce.pdf7,59 MBAdobe PDFView/Open
leon_ce(acta).pdf112,44 kBAdobe PDFView/Open