Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.14076/21761
Title: Diseño de plan de mantenimiento basado en confiabilidad para reducir las paradas de camiones mineros 793F
Authors: Loyola Flores, Jhonnatan Joel
Advisors: Abregú Leandro, Edwin Asención
Keywords: Maquinaria pesada;Mantenimiento;Camiones mineros;Mantenimiento centrado en la confiabilidad (RCM)
Issue Date: 2020
Publisher: Universidad Nacional de Ingeniería
Abstract: El presente trabajo de suficiencia profesional estudia diseñar un plan de mantenimiento basado en confiabilidad para los camiones mineros 793F con la finalidad de reducir las paradas no programadas que se suscitan durante la operación de camiones 793F. El diseño del plan de mantenimiento se desarrolla en los yacimientos de la sierra norte del Perú, se aplica en la operación minera a tajo abierto de propiedad de la Compañía Antamina. Con la finalidad de la ejecución de la presente tesis, se ha recopilado información de los historiales de mantenimiento, estructura de los mantenimientos, información del fabricante y estado de operación en campo de los camiones. Se realizó un análisis del historial de mantenimiento; analizando al detalle las paradas con más frecuencia y las paradas con mayor tiempo apoyándose de la información proporcionada por el fabricante. Finalmente, se determinaron las actividades para incluirlas en el plan de mantenimiento, acompañados con los formatos de evaluación e inspección que se elaboraron para realizar las actividades de mantenimiento con la finalidad de reducir las paradas de los camiones 793F.
This professional competency work is studying the design of a reliability based maintenance plan for 793F mining trucks in order to reduce unscheduled downtime that occurs during truck operation. The design of the maintenance plan is developed in the deposits of the highlands of northern Peru, it is applied in the open-pit mining operation owned by the company Antamina. In order to execute this thesis, information has been gathered from the maintenance records, the maintenance structure, the manufacturer's information and the field operating status of the trucks. A maintenance history analysis was performed; Analyzing in detail the stops with more frequency and the stops with time of May using the information provided by the manufacturer. Finally, it was determined that the activities would be included in the maintenance plan together with the evaluation and inspection forms that were prepared to carry out the maintenance activities in order to reduce the stops of the 793F trucks.
URI: http://hdl.handle.net/20.500.14076/21761
Rights: info:eu-repo/semantics/restrictedAccess
Appears in Collections:Ingeniería Mecánica

Files in This Item:
File Description SizeFormat 
loyola_fj.pdf9,01 MBAdobe PDFView/Open
loyola_fj(acta).pdf961,9 kBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI