Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.14076/21818
Title: | Cálculo de un sistema de bombeo para transporte de mineral en una planta concentradora |
Authors: | Pariona Martínez, Kotska Rony |
Advisors: | Sarmiento Sarmiento, Enrique |
Keywords: | Sistemas de bombeo;Transporte de mineral;Plantas concentradoras |
Issue Date: | 2020 |
Publisher: | Universidad Nacional de Ingeniería |
Abstract: | La Planta N° 02 de la unidad minera, en Febrero del 2017, el molino primario 20’x30’ debido a las fallas en el motor, se encontraba inoperativo. Esto ha generado que la capacidad de tratamiento de Pb-Zn se reduzca, aproximadamente, a 600 TMPH, se desea recuperar la capacidad de tratamiento de la Planta N° 02 (1200 TMPH) para los meses de Agosto del 2017 a Marzo del 2018. Para esto, se usarán los molinos 10.5’x14’ y 16’x22’
como molinos primarios de la Planta N° 02 y el molino Dominion, ubicado en la Planta N° 01 como molino secundario. En ese sentido, se elabora un proyecto que contempla la ingeniería, adquisición e instalación de un sistema de bombeo para realizar el transporte del mineral desde la Planta N° 02 hacia la Planta N° 01 y para realizar el retorno del mineral desde la Planta N° 01 hacia la Planta N° 02. Teniendo como objetivo principal el uso del molino Dominion de la Planta N° 01 con la finalidad de Incrementar la producción en el circuito Pb-Zn de la Planta N° 02 de 600 TMPH a 1200 TMPH.
En el presente trabajo se realizó el cálculo de un sistema de bombeo para transporte de mineral Pb-Zn desde la Planta N° 02 hacia la Planta N° 01 utilizando ecuaciones teóricas, experimentales, así como las ecuaciones de transporte de mecánica de fluidos. Plant No. 02 of the mining unit, in February 2017, the 20'x30 'mill was inoperative due to engine failures. This has caused the Pb-Zn treatment capacity to be reduced to approximately 600 TMPH, it is desired to recover the treatment capacity of Plant No. 02 (1200 TMPH) for the months of August 2017 to March 2018. To Therefore, the 10.5'x14 'and 16'x22' mills will be used as primary mills of Plant No. 02 and the Dominion mill, located in Plant No. 01 as secondary mill. In this sense, a project is developed that includes the engineering, procurement and installation of a pumping system to transport the mineral from Plant No. 02 to Plant No. 01 and to return the mineral from Plant No. 01 to Plant No. 02. Having as main objective the use of the Dominion mill of Plant No. 01 in order to Increase production in the Pb-Zn circuit of Plant No. 02 from 600 TMPH to 1200 TMPH. In the present work, the calculation of a pumping system for transportation of Pb-Zn mineral from Plant No. 02 to Plant No. 01 was performed using theoretical and experimental equations, as well as the fluid mechanics transport equations. |
URI: | http://hdl.handle.net/20.500.14076/21818 |
Rights: | info:eu-repo/semantics/restrictedAccess |
Appears in Collections: | Ingeniería Mecánica y Electrica |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
pariona_mk.pdf | 6,85 MB | Adobe PDF | View/Open | |
pariona_mk(acta).pdf | 86,63 kB | Adobe PDF | View/Open |
This item is licensed under a Creative Commons License
Indexado por: