Title: Profundización del pique 650 del nivel 16 al nivel 20, Unidad Minera Americana de la Compañía Minera Casapalca S.A.
Authors: Meza Zevallos, Edson Kevin
Advisors: Chávez Valdivia, Adolfo Jesús
Keywords: Compañía Minera Casapalca S.A.;TALLANES MINING GROUP SAC.;Piques (minería);Extracción de minerales
Issue Date: 2021
Publisher: Universidad Nacional de Ingeniería
Abstract: El presente trabajo de Tesis pretende establecer las pautas para la profundización del Pique 650 Zona Cuerpos Mery llevado a cabo por Cía. Minera Casapalca S.A. ubicada en el distrito de Chicla, Provincia de Huarochirí - Lima; con la finalidad de mejorar el álgido problema de la extracción de mineral de los niveles inferiores (debajo del Nv 14) en la zona de Cuerpos Mery mediante el método de inclinados sucesivos y acarreo por rampa; método que resulto lento y antieconómico a medida que se profundizaba la mina. La investigación establece desde el diseño, planeamiento, excavación, sostenimiento, trabajos de obras civiles y montaje de equipos de izaje realizados durante la construcción y puesta en marcha del Pique 650, obra que ha permitido contar con una capacidad de extracción de mineral de 30,000 Ton/mes en la zona de Cuerpos. La profundización del Pique 650, consiste en la construcción de un pique vertical de 1000 metros aprox. desde el nivel 1 hasta el nivel 20, sección de 2.4m x 5.6m, 03 compartimentos: 01 para camino y 02 para izaje con Skips de 10 Ton., Pockets de almacenamiento de 1000 Ton y una Cámara para un Winche de izaje. Con la puesta en operación del pique se pretende continuar la operación de la mina por otros 10 años y reducir los costos de extracción de mineral. La ejecución de los trabajos del Pique 650 está a cargo de la empresa contratista LOS TALLANES MINING GROUP SAC.
The present thesis work aims to establish the guidelines for the deepening of Pique 650 Zone Cuerpos Mery carried out by Cía. Minera Casapalca S.A. located in the district of Chicla, Province of Huarochirí - Lima; in order to improve the critical problem of mineral extraction from the lower levels (below level 14) in the Cuerpos Mery area through the method of successive slopes and ramp hauling; This was a slow and uneconomical method as the mine deepened. The investigation establishes from the design, planning, excavation, support, civil works works and assembly of lifting equipment carried out during the construction and commissioning of Shaft 650, a work that has allowed us to have a mineral extraction capacity of 30,000 Ton / month in the Cuerpos area. The deepening of Shaft 650, consists of the construction of a vertical shaft of 1000 meters approx. from level 1 to level 20, section of 2.4m x 5.6m, 03 compartments: 01 for road and 02 for lifting with 10 Ton Skips., 1000 Ton Storage Pockets and a Chamber for a Hoisting Winch. With the commissioning of the shaft, it is intended to continue the operation of the mine for another 10 years and reduce the costs of mineral extraction. The execution of the Pique 650 works is in charge of the contractor company LOS TALLANES MINING GROUP SAC.
URI: http://hdl.handle.net/20.500.14076/22118
Rights: info:eu-repo/semantics/restrictedAccess
Appears in Collections:Ingeniería de Minas

Files in This Item:
File Description SizeFormat 
meza_ze.pdf6,11 MBAdobe PDFView/Open
meza_ze(acta).pdf120,51 kBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI