Title: | Incremento de avances horizontales con taladros de 6.1. metros en mina subterránea |
Authors: | Champac Arias, Jersson Ferrer |
Advisors: | Brañes Gallardo, Henry Diomedes |
Keywords: | Minería subterránea;Taladros;Procesos de perforación |
Issue Date: | 2021 |
Publisher: | Universidad Nacional de Ingeniería |
Abstract: | Esta tesis es una propuesta que busca implementar los taladros de 6.1 metros en el proceso de perforación mecanizada de avances horizontales que ayudaran a incrementar los metros de avances en las empresas mineras subterráneas y con ello reducir los costos operativos de los metros programado mes a mes. Es de enfoque cuantitativo y diseño experimental. El desarrollo de la investigación crea un escenario de comparación entre un jumbo con barreno para realizar taladros de 4.3 metros y el jumbo adaptado para realizar taladros de 6.1 metros, con el fin de evaluar el funcionamiento del equipo en el aumento de avance por disparo y su factibilidad; además de identificar opciones de mejora en el proceso. Como resultado, se encontró que la implementación de taladros de 6.1 metros logro aumentar los avances por encima de los 5 metros; pero demanda tiempos superiores al promedio del jumbo de 4.3 metros, esto debido al mecanismo del equipo para colocar los barrenos. Por lo tanto, no genera benéficos en los aspectos técnicos económicos a la mina. This thesis is a proposal that look for implementing 6.1 meters drills in the mechanized drilling process of horizontal advances that will help improve the meters of advances in underground mining companies and thereby reduce the operation costs of the meters program month by month. It has a quantitative approach and experimental design. The development of the research creates a comparison scenario between a jumbo with an arm to 4.3 meters drill and the jumbo adapted to 6.1 meters drill, in order to evaluate the operation of equipment to increase the advance per blasting and its feasibility; in addition to identifying options for improvement in the process. As a result, it was found that the implementation of 6.1 meters drills was able to increase the advances above 5 meters; but it demands times higher than the average using a 4.3 meter jumbo, this due to the mechanism of the equipment to place the holes. Therefore, it does not generate benefits in technical economic aspects to the mine. |
URI: | http://hdl.handle.net/20.500.14076/22121 |
Rights: | info:eu-repo/semantics/restrictedAccess |
Appears in Collections: | Ingeniería de Minas |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
champac_aj.pdf | 3,35 MB | Adobe PDF | View/Open | |
champac_aj(acta).pdf | 111,55 kB | Adobe PDF | View/Open |
This item is licensed under a Creative Commons License
Indexado por: