Title: Análisis de peligros en planta de tratamiento de residuos sólidos del Aeropuerto Internacional Jorge Chávez mediante metodología Hazop
Authors: Gamarra Minaya, Renzo Daniel
Advisors: Villena Chávez, Jorge Alberto
Keywords: Peligro;Riesgo;HAZOP;Intolerable;Indeseable
Issue Date: 2021
Publisher: Universidad Nacional de Ingeniería
Abstract: El presente trabajo de investigación tuvo como objetivo general analizar los peligros en la planta de tratamiento de residuos sólidos del Aeropuerto Internacional Jorge Chávez (AIJC) mediante la metodología HAZOP, planteándose como hipótesis: las medidas que se apliquen correctamente y que fueron resultado del análisis bajo la metodología HAZOP disminuirá el riesgo asociado a los peligros en la planta de tratamiento de residuos sólidos del AIJC. Ahora bien, La cantidad de nodos obtenida para el tratamiento de residuos sólidos del AIJC fue de 23 nodos, siendo el sistema de suministro de agua, ablandamiento y solución de lejía el mayor con un total de nueve; la cantidad de parámetros identificados en el tratamiento de residuos sólidos del AIJC fue de 28, siendo el sistema de caldera y distribución de vapor el que obtuvo la mayor cantidad de parámetros identificado con 10; en el tratamiento de residuos sólidos del AIJC los peligros que tienen un nivel de riesgo intolerables son seis, los que tienen un nivel de riesgo indeseable son ocho, lo que tiene un riesgo aceptable con control son 10 y los que tienen un nivel de riesgo razonablemente aceptable son 4; se estima que las recomendaciones basadas en la metodología lograran disminuir los riesgos intolerables a cero, los riesgos indeseables a tres. Se concluye estas diferencias entre los riesgos antes y después de las recomendaciones es significativa estadísticamente, debido a que se obtuvo un valor de significancia igual a 0.000.
The general objective of this research work was to analyze the hazards in the solid waste treatment plant at Jorge Chavez International Airport (AIJC) using HAZOP methodology. The hypothesis was: the measures that are correctly applied and that were the result of the analysis under HAZOP methodology will reduce the risk associated with the hazards in the AIJC's solid waste treatment plant. Now, the amount of nodes obtained for the treatment of solid waste of the AIJC was 23 nodes, being the system of water supply, softening and bleach solution the biggest with a total of nine; the amount of parameters identified in the treatment of solid waste of the AIJC was 28, being the system of boiler and steam distribution the one that obtained the biggest amount of parameters identified with 10; In the AIJC's solid waste treatment, the hazards that have an intolerable risk level are six, those that have an undesirable risk level are eight, those that have an acceptable risk level with control are 10 and those that have a reasonably acceptable risk level are 4; it is estimated that the recommendations based on the methodology will manage to reduce the intolerable risks to zero, the undesirable risks to three. It is concluded that these differences between the risks before and after the recommendations are statistically significant, because a value of significance equal to 0.000 was obtained.
URI: http://hdl.handle.net/20.500.14076/22301
Rights: info:eu-repo/semantics/openAccess
Appears in Collections:Ingeniería de Higiene y Seguridad Industrial

Files in This Item:
File Description SizeFormat 
gamarra_mr.pdf1,1 MBAdobe PDFView/Open
gamarra_mr(acta).pdf2,82 MBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI