Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.14076/22788
Title: Optimización de la producción de petróleo, utilizando unidades de bombeo con carrera larga, en el noreste peruano
Authors: Veliz Auris, Maik
Advisors: Del Castillo Rodríguez, Luis Antonio
Keywords: Producción de petróleo;Unidades de bombeo
Issue Date: 2022
Publisher: Universidad Nacional de Ingeniería
Abstract: En esta tesis de optimización de la producción utilizando un sistema de levantamiento artificial de una unidad de carrera larga, será realizado en el lote VI, VII, operado por CNPC – SAPET. Los métodos para levantamiento artificial utilizados en estos lotes son: Gas Lift, Plunger Lift, Casing SWAB, SWAB, unidad de bombeo mecánico con motor a gas (PUG, unit pumping gas) y unidad de bombeo mecánico con motor eléctrico (PUE, unit pumping electric). Para este último método mencionado, por bombeo mecánico PUE, no se realizaron los estudios necesarios para mejorar la eficiencia de dicho sistema. Se describirá los sistemas de levantamiento artificial por bombeo mecánico, en particular el sistema de bombeo con carrera larga, que es objetivo de esta tesis. Se muestra la situación actual de los lotes VI, VII, en tanto a su sistema de levantamiento artificial y producción. También, se realizará un estudio técnico económico, comparando entre el sistema propuesto (unidad con carrera larga) y unidad de bombeo convencional. Se elaborarán cuadros y diseños, para mostrar la efectividad del sistema propuesto, con sus respectivos análisis costo beneficio, con todos los indicadores financieros para determinar su efectividad.
In this production optimization thesis using an artificial lift system of a long stroke unit, it will be carried out in lot VI, VII, operated by CNPC –SAPET. The methods used for artificial lift used in these lots are: Gas Lift, Plunger Lift, Casing SWAB, SWAB, surge, mechanical pumping unit with gas engine (PUG, unit pumping gas) and mechanical pumping unit with electric motor (PUE, unit pumping electric). For this last method, we will describe mechanical pumping by Artificial lift systems, in particular the long-stroke pumping system, which is the objective of this thesis. The current situation of lots VI, VII is shown, in terms of their artificial lift and production system. An economic technical study will also be carried out, comparing between the proposed system (unit with long stroke) and the conventional pumping unit. Tables and designs will be prepared to show the effectiveness of the proposed system, with their respective cost-benefit analysis with all the financial indicators to determine effectiveness.
URI: http://hdl.handle.net/20.500.14076/22788
Rights: info:eu-repo/semantics/restrictedAccess
Appears in Collections:Ingeniería de Petróleo

Files in This Item:
File Description SizeFormat 
veliz_am.pdf4,27 MBAdobe PDFView/Open
veliz_am(acta).pdf134,02 kBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI