Por favor, use este identificador para citar o enlazar este ítem:
http://hdl.handle.net/20.500.14076/24847
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Salazar Dulanto, Eder León | - |
dc.contributor.author | Mera Villalobos, Jorge Arnulfo | - |
dc.creator | Mera Villalobos, Jorge Arnulfo | - |
dc.date.accessioned | 2023-06-01T20:06:21Z | - |
dc.date.available | 2023-06-01T20:06:21Z | - |
dc.date.issued | 2023 | - |
dc.identifier.uri | http://hdl.handle.net/20.500.14076/24847 | - |
dc.description.abstract | El presente trabajo de investigación aplicada de esta tesis corresponde a una evaluación de variables controlables del diseño del corte y del pre-corte para delimitar las labores mineras de producción en explotación; así como la aplicación del modelo matemático postulado por O´hara para lograr reducir la dilución en las labores mineras de una mina subterránea ubicada en el Centro del Perú. Las labores mineras que se eligieron aleatoriamente como muestras fueron: Veta Split NE Carmen y Veta Ramal 85 piso con secciones de dimensiones de 3.50m x 4.0m; y las otras tres labores mineras Veta Janeth y Veta Nancy con secciones con dimensiones de 4.0m x 4.50m respectivamente. La selección del corte con la perforación de 7 taladros paralelos, de los cuales 4 taladros fueron de 102mm de diámetro, que funcionaron como cara libre y tres taladros cargados con emulsión en comparación a los resultados del primer caso-estudio se obtuvo una reducción de 34.08$/corte que representa un ahorro del 19%. Así mismo, para el pre-corte convencional con cargas espaciadas entre 3 emulsiones y cargado alternadamente entre estos taladros con un espaciamiento de 0.50m entre taladro y taladro, se obtuvo una reducción de 100.30$ que representa un ahorro del 40% en comparación al primer caso-estudio. Entonces, aplicando el modelo matemático postulado por O’hara para conseguir una dilución aceptable por debajo del 20%, en promedio en estas cinco labores mineras (tabla 4,2) se obtuvo un promedio del 15%. En el primer caso-estudio usando los modelos matemáticos convencionales se obtuvo un promedio de dilución del 59% (tabla 4,1). Entonces, se puede enfatizar que si se obtuvieron mejoras. | es |
dc.description.abstract | The present applied research work of this thesis corresponds to an evaluation of controllable variables of the design of the cut and the pre-splitting to delimit the mining labors of production in exploitation; likewise the application of the mathematical model postulated by Ohara to reduce dilution in the mining workings of an underground mine located in the center of Peru. The mining works, which were randomly chosen as samples, were: Veta Split NE Carmen and Veta Ramal 85 floor with sections of dimensions of 3.50m x 4.0m, and the other three mining works Veta Janeth and Veta Nancy with sections measuring 4.0m x 4.50m, respectively. The selection of the cut with the drilling of 7 parallel holes, of which 4 holes were 102mm in diameter, which functioned as a free face and three holes loaded with emulsion, compared to the results of the first case-study, made a reduction of 34.08 $/cut representing a thrift of 19%. Likewise, the conventional pre-splitting with loads spaced between 3 emulsions and loaded alternately between these holes with a spacing of 0.50m between hole and hole, made a reduction of $ 100.30, which represents a saving of 40% compared to the first case-study. In this sense, applying the mathematical model postulated by O’hara to achieve an acceptable dilution below 20%, an average of 15% was achieved in these five mining operations (table 4.2). Conversely, in the first case-study, using conventional mathematical models, an average dilution of 59% was obtained (table 4.1). Therefore, it can be emphasized that improvements were accomplished carrying out this breakthrough model. | en |
dc.description.uri | Tesis | es |
dc.format | application/pdf | es |
dc.language.iso | spa | es |
dc.publisher | Universidad Nacional de Ingeniería | es |
dc.rights | info:eu-repo/semantics/openAccess | es |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | es |
dc.source | Universidad Nacional de Ingeniería | es |
dc.source | Repositorio Institucional - UNI | es |
dc.subject | Cortes paralelos | es |
dc.subject | Pre-corte convencional | es |
dc.subject | Dilución | es |
dc.subject | Labores mineras subterráneas | es |
dc.subject | Vetas | es |
dc.subject | Frontón | es |
dc.title | Aplicación de O'hara para reducir la dilución en una operación minera subterránea | es |
dc.type | info:eu-repo/semantics/bachelorThesis | es |
thesis.degree.name | Ingeniero de Minas | es |
thesis.degree.grantor | Universidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgica | es |
thesis.degree.level | Título Profesional | es |
thesis.degree.discipline | Ingeniería de Minas | es |
thesis.degree.program | Ingeniería | es |
renati.advisor.orcid | https://orcid.org/0000-0002-1400-3144 | es |
renati.author.dni | 46958002 | - |
renati.advisor.dni | 08529574 | - |
renati.type | http://purl.org/pe-repo/renati/type#tesis | es |
renati.level | http://purl.org/pe-repo/renati/nivel#tituloProfesional | es |
renati.discipline | 724026 | - |
renati.juror | Rosales Huamani, Jimmy Aurelio | - |
renati.juror | Hernández Díaz, Víctor Manuel | - |
dc.publisher.country | PE | es |
dc.subject.ocde | http://purl.org/pe-repo/ocde/ford#2.07.05 | es |
Aparece en las colecciones: | Ingeniería de Minas |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
mera_vj.pdf | 4,76 MB | Adobe PDF | Visualizar/Abrir | |
informe_de_similitud.pdf | 122,73 kB | Adobe PDF | Visualizar/Abrir | |
mera_vj(acta).pdf | 98,49 kB | Adobe PDF | Visualizar/Abrir | |
carta_de_autorización.pdf | 174,37 kB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons
Indexado por: