Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.14076/27350
Title: Estimación de reservas para una mina a cielo abierto en vetas
Authors: Meléndez Huamán, Omar Alex
Advisors: Marín Suárez, Valeriano Alfredo
Keywords: Minería a cielo abierto;Reservas de minerales
Issue Date: 2023
Publisher: Universidad Nacional de Ingeniería
Abstract: Las reservas de una mina plantean una gran base a partir de la cual se pueden realizar otros trabajos posteriores relacionados con la planificación minera en diversos horizontes. En este trabajo se realiza una estimación de reservas del yacimiento denominado Yen, que venía siendo explotada de manera operativa sin tener una base técnica hacia donde orientarse. Yen no tenía el diseño de un pit final que limite realmente las reservas económicas, ni tampoco una secuencia de minado LOM, ni la proyección de botaderos, ni un planeamiento estratégico de la producción. La presente tesis tiene por objetivo la estimación de reservas de Yen para mejorar el diseño final, el planeamiento de minado y la valorización de la mina. Para dar solución al problema planteado se hará una revisión general de las teorías y experiencias que se tienen en bibliografía relacionadas, y luego se interrelacionará este conocimiento para que se puedan adecuar al objetivo general de esta tesis, y que proporcione resultados confiables desde el punto de vista técnico-económico. Como resultado se obtuvo un pit final que tiene 391,531 TMS de mineral con un valor de NSR de 56.71 US$/t como reservas.
The reserves of a mine pose a large base from which other subsequent work related to mine planning can be carried out in various horizons. In this work, an estimation of reserves of the deposit called Yen is carried out, which had been exploited in an operational manner without having a technical base to which to orient itself. Yen did not have the design of a final pit that really limits the economic reserves, nor did it have a sequence of LOM mining, nor the projection of dumps, nor a strategic planning of production. This thesis aims to estimate Yen reserves to improve the final design, mining planning and mine valuation. In order to solve the problem posed, a general review of the theories and experiences in the related bibliography will be made, and then this knowledge will be interrelated so that they can be adapted to the general objective of this thesis, and that it provides reliable results from the point of view of technical-economic point of view. As a result, a final pit was obtained that has 391,531 DMT of ore with a NSR value of US$56.71/t as reserves.
URI: http://hdl.handle.net/20.500.14076/27350
Rights: info:eu-repo/semantics/openAccess
Appears in Collections:Ingeniería de Minas

Files in This Item:
File Description SizeFormat 
melendez_ho.pdf3,4 MBAdobe PDFView/Open
carta_de_autorización.pdf172,2 kBAdobe PDFView/Open
informe_de_similitud.pdf293,48 kBAdobe PDFView/Open
melendez_ho(acta).pdf192,42 kBAdobe PDFView/Open


This item is licensed under a Creative Commons License Creative Commons

Indexado por:
Indexado por Scholar Google LaReferencia Concytec BASE renati ROAR ALICIA RepoLatin UNI