Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.14076/27369
Title: | Instalaciones sanitarias en el Hospital de contingencia de Chota - Cajamarca |
Authors: | Reyes Acosta, Anthony Manuel |
Advisors: | Salazar Gavelán, Roger Edmundo |
Keywords: | Instalaciones sanitarias;Instalaciones sanitarias en hospitales;Chota, Cajamarca (Perú : Provincia) |
Issue Date: | 2024 |
Publisher: | Universidad Nacional de Ingeniería |
Abstract: | El presente informe consiste en el diseño de las Instalaciones Sanitarias del Hospital de Contingencia de Chota – Cajamarca, el cual consta de 9 Unidades Productoras de Servicios de Salud (UPSS), con un total de 42 camas de hospitalización, de las cuales 14 serán destinadas a Unidades de Cuidados Intensivos (UCI).
Las UPPS consideradas en el Plan Médico Arquitectónico son las siguientes:
✓ Consulta externa.
✓ Farmacia.
✓ Emergencia.
✓ Centro quirúrgico.
✓ Central de esterilización.
✓ Centro obstétrico.
✓ Hospitalización.
✓ Nutrición y dietética.
✓ Gestión ambiental.
Para abastecer dicha edificación se ha determinado una dotación de agua dura de 75 m3, esto de acuerdo a lo estipulado en el Reglamento Nacional de Edificaciones (RNE), y para la red de recolección de desagüe se ha proyectado 3 salidas hacia los buzones de la calle principal, los cuales fueron construidos para el presente proyecto.
Asimismo, el presente diseño contempla el tratamiento preliminar de las aguas residuales provenientes de los ambientes de cocina. This report consists of the design of the Health Facilities of the Chota – Cajamarca Contingency Hospital, which consists of 9 Health Services Producing Units, with a total of 42 hospitalization beds, of which 14 will be allocated to Intensive Care Units (ICU). The Health Services Producing Units (UPSS) considered in the Architectural Medical Plan are the following: ✓ External consultation. ✓ Pharmacy. ✓ Emergency. ✓ Surgical center. ✓ Sterilization center. ✓ Obstetric center. ✓ Hospitalization. ✓ Nutrition and dietetics. ✓ Environmental management. To supply said building, a hard water supply of 75 m3 has been determined, in accordance with the provisions of the National Building Regulations, and for the drainage collection network, 3 outlets have been projected towards the mailboxes of the main street, which were built for this project. Likewise, this design contemplates the preliminary treatment of wastewater from kitchen environments. |
URI: | http://hdl.handle.net/20.500.14076/27369 |
Rights: | info:eu-repo/semantics/openAccess |
Appears in Collections: | Ingeniería Sanitaria |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
reyes_aa.pdf | 23,26 MB | Adobe PDF | View/Open | |
carta_de_autorización.pdf | 676,33 kB | Adobe PDF | View/Open | |
reyes_aa(acta).pdf | 465,89 kB | Adobe PDF | View/Open | |
informe_de_similitud.pdf | 931,91 kB | Adobe PDF | View/Open |
This item is licensed under a Creative Commons License
Indexado por: