Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.14076/27484
Title: | Estudio, diseño y optimización del sistema de ventilación actual y proyectada con el Software Ventsim TM Design de una unidad minera subterránea |
Authors: | Hernandez Arancel, Erika Yuliana |
Advisors: | Hernández Diaz, Víctor Manuel |
Keywords: | Dirección de flujo de aire;Requerimiento de aire fresco;Cobertura de aire;Velocidad de aire |
Issue Date: | 2024 |
Publisher: | Universidad Nacional de Ingeniería |
Abstract: | Se analizaron 14 ingresos de aire fresco y 10 salidas de aire viciado y 34 estaciones secundarias; se midió velocidades de aire, concentraciones de gases, condiciones termo ambientales y la dirección del flujo de aire. Se evaluaron las condiciones actuales de operación con el siguiente resultado: La ventilación de la Mina es por “tiro natural”, se tiene un Total de 296,510 cfm de ingreso de aire fresco y 301,970 cfm de salida de aire usado.
El requerimiento de Aire actual es 173,826 cfm, cumpliéndose con una Cobertura real de 171%, nos indica que si cumple con su Requerimiento de aire según el D.S. Nº. 024-2016-EM y su Modificatoria D.S. Nº. 023-2017-EM; sin embargo, la distribución del flujo de aire no es la correcta, así como también las velocidades del aire mínimo debe de ser 25 m/min por el uso de ANFO.
A corto plazo, se deberá cambiar a un sistema de ventilación forzado, para ello se plantearon proyectos, el cual requería la adquisición e instalación de los siguientes ventiladores: (02) 80k cfm, (01) 60k cfm y la instalación de una compuerta en la GL 06E del Nv 4530 con la finalidad que se direccione el flujo correctamente.
A mediano plazo, se plantean proyectos para la Zona Carmen y Ore Sorting e instalación de los siguientes ventiladores: (01) 80k cfm en el RB 01, (01) 80k cfm en el RB 02 y otro de 150k cfm en el RB 03. Con estos proyectos planteados se proyecta un CAPEX de 834,403 US$. 14 fresh air inlets and 10 stale air outlets and 34 secondary stations were analyzed; Air velocities, gas concentrations, thermo-environmental conditions and the direction of air flow were measured. The current operating conditions were evaluated with the following result: The ventilation of the Mine is by “natural draft”, there is a Total of 296,510 cfm of fresh air intake and 301,970 cfm of used air output. The current Air requirement is 173,826 cfm, complying with a real Coverage of 171%, it tells us that if it meets its Air Requirement according to the D.S. 024-2016-EM and its Modifying D.S.N°. 023-2017-EM; However, the distribution of the air flow is not correct, as well as the minimum air speeds must be 25 m/min due to the use of ANFO. In the short term, it will be necessary to change to a forced ventilation system, for this projects are proposed, which required the acquisition and installation of the following fans: (02) 80k cfm, (01) 60k cfm and the installation of a damper in the GL 06E of Lv 4530 in order to direct the flow correctly. In the medium term, projects are proposed for the Carmen and Ore Sorting Zone and installation of the following fans: (01) 80k cfm in RB 01, (01) 80k cfm in RB 02 and another 150k cfm in RB 03. With these proposed projects, a CAPEX of 834,403 US$ is projected. Keywords — air flow direction, fresh air requirement, air coverage, air velocity. |
URI: | http://hdl.handle.net/20.500.14076/27484 |
Rights: | info:eu-repo/semantics/restrictedAccess |
Appears in Collections: | Ingeniería de Minas |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
hernandez_ae.pdf | 4,9 MB | Adobe PDF | View/Open | |
hernandez_ae(acta).pdf | 321,64 kB | Adobe PDF | View/Open | |
informe_de_similitud.pdf | 386,58 kB | Adobe PDF | View/Open | |
carta_de_autorización.pdf | 410,1 kB | Adobe PDF | View/Open |
This item is licensed under a Creative Commons License
Indexado por: